Core Viewpoint - The article discusses the public tender for a 335MWh energy storage system project by Guodian Power in Xinjiang, highlighting the project's scope, requirements, and timelines for delivery [2][3][4]. Project Overview - The project involves the construction of a 335MWh energy storage system across three counties in Xinjiang: Bole County, Yanqi County, and Hejing County, with specific geographical and logistical details provided for each site [2]. - The energy storage system is designed to have a capacity of no less than 167.5MW/335MWh, including various components such as battery packs, management systems, and transformers [3]. Tender Scope and Requirements - The tender includes the complete design, procurement, assembly, transportation, and installation guidance for the energy storage system [3]. - The supplier is responsible for the quality assurance and maintenance of the system during the warranty period, ensuring performance standards are met [3]. Delivery Timeline and Locations - The project aims to complete the delivery of equipment for the Yanqi and Hejing solar projects by May 5, 2025, and for the Bole solar project by July 31, 2025 [4]. Qualification and Performance Requirements - Bidders must be legally registered entities and manufacturers of specific components related to the energy storage system [5]. - Bidders are required to have prior experience with contracts for energy storage systems of at least 40MW/80MWh scale [6]. Upcoming Industry Events - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) is scheduled for April 10-12, 2025, in Beijing, featuring over 800 exhibitors and numerous thematic forums [8][11].
国能巴州抽水蓄能配套335MWh储能系统设备招标
中关村储能产业技术联盟·2025-03-29 11:10