Core Viewpoint - The article discusses the results of the 2025 annual centralized bidding for energy storage systems by the State Power Investment Corporation, highlighting the awarded contracts and the total capacity involved in the bidding process [1][2]. Group 1: Bidding Results - The total capacity for this centralized bidding was 5 GWh, with six companies winning contracts [1][3]. - The awarded shares for the winning companies are as follows: - Shanghai Ronghe Yuanchu Energy Co., Ltd.: 1500 MWh - Beijing Haibo Sichuang Technology Co., Ltd.: 1400 MWh - Xinyuan Zhichu Energy Development (Beijing) Co., Ltd.: 800 MWh - Jiangsu Trina Storage Co., Ltd.: 600 MWh - CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd.: 400 MWh - Beijing Tiancheng Tongchuang Electric Co., Ltd.: 300 MWh [2][3]. Group 2: Bidding Details - The bidding included both centralized and string-type energy storage systems, suitable for shared or supporting storage, with options for 2-hour (0.5C rate) and 4-hour (0.25C rate) solutions [3][5]. - The breakdown of the centralized storage system bids includes: - Beijing Haibo Sichuang Technology Co., Ltd.: 1400 MWh at a bid price of 1.7592 billion yuan (0.440 yuan/Wh) - Shanghai Ronghe Yuanchu Energy Co., Ltd.: 1000 MWh at a bid price of 1.704 billion yuan (0.426 yuan/Wh) - Xinyuan Zhichu Energy Development (Beijing) Co., Ltd.: 800 MWh at a bid price of 1.7192 billion yuan (0.430 yuan/Wh) - Jiangsu Trina Storage Co., Ltd.: 400 MWh at a bid price of 1.688 billion yuan (0.422 yuan/Wh) - CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd.: 400 MWh at a bid price of 1.69032 billion yuan (0.423 yuan/Wh) [3][4]. Group 3: Equipment and Services - The bidding scope includes the supply of a complete set of equipment for energy storage systems, such as lithium iron phosphate batteries, bidirectional converters, battery management systems, energy management systems, transformers, and related facilities [4]. - The bidders are responsible for transportation, insurance, on-site delivery, installation guidance, testing, trial operation participation, acceptance cooperation, and after-sales service, ensuring compliance with grid and energy management standards [4][5].
中标份额出炉!6企分获国电投5GWh集采订单
中关村储能产业技术联盟·2025-05-08 06:00