Core Viewpoint - The article discusses the announcement of an EPC tender for a 300MW/1200MWh shared energy storage project in the Jingxing Mining District, highlighting its construction details and requirements for bidders [1][2]. Group 1: Project Overview - The project is located in the Jingxing Mining District, Shijiazhuang City, specifically at the north side of the West Section of Industrial Avenue, Jiazhuang Town [3]. - The energy storage project will have a total capacity of 300MW and 1200MWh, consisting of 120 sets of 2.5MW/5MWh energy storage subsystems, each including two energy storage systems (lithium iron phosphate battery systems) and one PCS medium-voltage integrated unit [3][4]. - A 220kV booster station will be constructed alongside the energy storage project, with a planned construction period of 365 days from the issuance of the construction order [4][5]. Group 2: Tender Conditions - The project has been approved for construction by the Shijiazhuang Jingxing Mining District Data and Government Service Bureau, with the project owner being Shijiazhuang Nuoqun Energy Technology Co., Ltd., which will fully fund the project [2]. - The tender is for the EPC (Engineering, Procurement, and Construction) contract, which includes surveying, design, procurement, construction, installation, commissioning, acceptance, and overall handover [5]. Group 3: Bidder Qualifications - Bidders must have independent legal entity status and possess specific qualifications, including comprehensive engineering surveying qualifications and relevant design and construction qualifications [7]. - Financial requirements include providing audited financial reports for the last three years (2021, 2022, 2023) [7]. - Bidders must not be listed as untrustworthy on the "Credit China" website and must meet specific personnel qualifications for project management, surveying, design, and construction [7][10].
河北石家庄井陉矿区300MW/1200MWh共享储能电站项目EPC招标
中关村储能产业技术联盟·2025-05-21 11:23