Core Viewpoint - BYD Energy has signed a storage order agreement with Grenergy to supply a 3.5GWh energy storage system for the Atacama Oasis Project in northern Chile, bringing the total cooperation volume to 6.5GWh [2][3]. Group 1 - The agreement includes the provision of 624 MC Cube-T BESS units for the Elena solar-storage power station, which has a photovoltaic capacity of 446MW and a storage capacity of 3.5GWh [3]. - The MC Cube-T BESS utilizes CTS (cell-to-system) super integration technology, significantly enhancing space utilization by 98% and achieving a Vcts (cell-to-system volume ratio) index exceeding 33%, offering advantages such as easy layout, installation, maintenance, capacity expansion, and transportation [3]. - The storage solution is designed to meet the high safety, protection, durability, and operational efficiency requirements of the complex and challenging Atacama Oasis Project, which is one of the largest electrochemical storage projects globally with a total storage capacity of 11GWh [3][4]. Group 2 - BYD Energy aims to contribute to the global clean energy transition through innovative technology and reliable service, as stated by the general manager of BYD's energy storage and new battery division [4].
3.5GWh!比亚迪再签大单