Workflow
鼓励虚拟电厂、用户侧储能参与!浙江省电力需求侧管理实施方案发布

Core Viewpoint - The article discusses the implementation plan for electricity demand-side management in Zhejiang Province for the summer peak of 2025, emphasizing the encouragement of virtual power plants and user-side energy storage to participate in demand response [1][8]. Group 1: Implementation Measures - The plan aims to achieve a balance between supply and demand by encouraging virtual power plants to participate in demand response, targeting a load adjustment capacity of 1 million kilowatts [1][10]. - Demand response measures will be implemented based on a "one-time declaration, rolling cycle, and day-ahead invocation" principle, with a goal of achieving a maximum agreed response capacity of 6 million kilowatts [1][10]. - The plan includes optimizing resource management by ensuring the availability of signed load management resources and conducting detailed studies on load characteristics in various industrial sectors [1][13]. Group 2: Incentive Policies - The plan proposes to improve the market-based bidding mechanism for demand response, prioritizing provincial subsidies through time-of-use surplus expenditures [2][12]. - New incentive mechanisms will be introduced for virtual power plants and other new market entities to maximize their adjustment capabilities [2][12]. Group 3: Subsidy Price Scheme - A detailed subsidy price scheme for various response types is outlined, including tiered subsidies based on response load and capacity [3][51]. - The subsidy structure includes both capacity and energy subsidies, with specific rates for different response types, such as 1 yuan per kilowatt per month for capacity and 4 yuan per kilowatt-hour for energy during peak periods [51][52]. Group 4: Load Management Goals - The overall load management goals for the province include achieving 200,000 kilowatts for air conditioning load control, 300,000 kilowatts for peak shaving, and 600,000 kilowatts for demand response [14][15]. - Each city within the province has specific targets for load management, contributing to the overall provincial goals [15].