Core Viewpoint - The article discusses the public tender announcement for the procurement of energy storage equipment by Xinjiang Li New Energy Co., Ltd. for its second batch of energy storage projects in 2025, with a total scale of 500MW/2000MWh [2][8]. Group 1: Project Overview - The tender is divided into three sections: - Section C: 100MW/400MWh energy storage system located in Hotan City [3]. - Section D: 200MW/800MWh energy storage system located in Pishan County [4]. - Section E: 200MW/800MWh energy storage system located in Minfeng County [5]. - The projects aim to construct energy storage stations and related facilities, including substations [10]. Group 2: Technical Requirements - The tender specifies that lithium iron phosphate batteries must achieve 6000 charge-discharge cycles under certain conditions or have an 8-year quality guarantee [6][12][14][15]. - The supply timeline requires 50% of the equipment to be delivered by September 20, 2025, and full delivery by October 20, 2025 [16][17][18]. Group 3: Bidder Qualifications - Bidders must be independent legal entities registered in China and possess manufacturing capabilities for at least one core component of the electrochemical energy storage system [20]. - Bidders must provide third-party certification for their lithium iron phosphate batteries and other components, along with a minimum contract signing performance of 2GWh in the last three years [20]. - Financial stability and good commercial reputation are required, with audited financial reports for the last three years [20]. Group 4: Tender Process - The tender documents can be obtained online from June 7 to June 26, 2025, with a fee of 2000 RMB [25][26]. - The deadline for submitting bids is June 27, 2025, at 10:30 AM [28].
500MW/2GWh!新疆立新能源2025年构网型储能系统招标