Core Viewpoint - The article discusses the initiation of the first settlement trial run for the Henan electricity spot market in 2025, highlighting the operational timeline, participant scope, and settlement mechanisms [1][11]. Group 1: Trial Run Details - The trial run will take place from June 19 to June 27, 2025, with market declarations starting on June 18 [1][11]. - The trial includes a two-day adjustment operation on June 19 and 20, followed by settlement from June 21 to 27 [1][11]. - During the adjustment period, the peak-shaving auxiliary service market will operate normally, requiring participants to declare their peak-shaving market intentions [1][11]. Group 2: Participant Scope - Participants include all regulated coal-fired power generation enterprises involved in existing medium- and long-term transactions, centralized renewable energy stations, and ordinary market electricity users [1][12]. - Independent storage facilities and virtual power plants are also included as new operational entities [1][12]. Group 3: Independent Storage Participation - A total of 12 independent storage stations will participate in the trial run, with specific capacities and energy storage details provided [3][4]. - Independent storage stations will participate in the spot market with a "report quantity, no price" approach, accepting local generation prices for incoming energy and a weighted average price for outgoing energy [2][26]. Group 4: Settlement Mechanism - The settlement during the trial run will follow a deviation settlement method, compensating independent storage for any costs incurred due to grid adjustments if total expenses fall below prior earnings [5][37]. - The minimum and maximum price limits for the spot energy market are set at 50 yuan/MWh and 1200 yuan/MWh, respectively, with future adjustments based on national requirements [2][27]. Group 5: Risk Control Measures - Independent storage will receive compensation if daily average energy earnings fall below 0.765 million yuan per 10,000 kW capacity during the trial run [6][43]. - The trial run includes measures to control profit and loss risks, with a limit set at ±0.02 yuan/kWh for both coal-fired power enterprises and user-side participants [52].
独立储能现货收益低时可获差额补偿!河南电力现货市场首次结算试运行,报价0.05~1.2元/kWh
中关村储能产业技术联盟·2025-06-18 03:59