Core Viewpoint - The article discusses the investigation report of a general object strike accident that occurred during the installation of a bus station in Shenzhen's Guangming District, resulting in one fatality and an economic loss of approximately 2.6 million RMB [2][11]. Group 1: Accident Overview - On April 14, 2024, a general object strike accident occurred during the installation project of the bus station on Sun Road, leading to one death and direct economic losses of about 2.6 million RMB [2][11]. - The accident was attributed to the failure of the supplier to fulfill safety management responsibilities and workers violating operational regulations [3]. Group 2: Project and Involved Companies - The construction unit for the project is the Shenzhen Guangming District Construction Engineering Office, with the main contractor being Shenzhen Yuetong Construction Engineering Co., Ltd. [4]. - The project involves several companies, including Guangdong Aizhuo Precision Manufacturing Co., Ltd. as the supplier and Guangdong Chengjiao Construction Engineering Co., Ltd. as the installation unit [4]. Group 3: Accident Details - The accident occurred when workers were unloading large glass panels, which became unstable due to improper handling and the vehicle's position, leading to the glass falling and striking a worker [6][9]. - The glass panels measured 1810mm in width, 3800mm in length, and weighed 150kg, which contributed to the severity of the incident [9]. Group 4: Responsibility and Recommendations - The investigation identified two main causes: unsafe behavior by the worker and unsafe conditions related to the vehicle's positioning and the lack of proper securing measures for the glass [12]. - Recommendations for administrative penalties were made against the responsible parties, including the main person in charge of Guangdong Aizhuo for failing to ensure safety measures [15][16].
公司副总亲自送货被压倒身亡!深圳官方通报
券商中国·2025-06-21 12:25