Core Viewpoint - The article discusses the bidding results for the 200MW/800MWh independent energy storage project by Hebei Hongbu Energy Technology Co., Ltd, highlighting the competitive pricing and the scope of the project [1][2]. Group 1: Bidding Results - The first candidate for the EPC contract is a joint venture between China Electric Power Construction Group Hebei Electric Power Survey and Design Institute Co., Ltd and China Railway Electrification Bureau Group Beijing Electrification Engineering Co., Ltd, with a bid price of 77,658,983.35 yuan and a unit price of 0.97 yuan/Wh [2]. - The second candidate is China Electric Power Construction Group Henan Electric Power Survey and Design Institute Co., Ltd, with a bid price of 79,500,169.95 yuan and a unit price of 0.99 yuan/Wh [2]. - The third candidate is Hebei Energy Engineering Design Co., Ltd, with a bid price of 80,001,435.69 yuan and a unit price of 1.00 yuan/Wh [2]. Group 2: Project Scope - The project scope includes comprehensive survey design, procurement, and construction contracting, covering initial design, construction drawings, completion drawings, land leasing work, construction, supply of equipment materials, installation engineering, debugging, and performance guarantee [2]. - Responsibilities also include procurement of necessary equipment and materials, defect repair caused by the contractor, overall project acceptance, quality warranty, and handling of compliance procedures and grid connection tests [2]. Group 3: Industry Context - In June, user-side energy storage installations reached a new high for 2025, with Hunan, Shandong, and Anhui leading the charge [3]. - The profitability challenges for commercial energy storage are increasing, with a 9% decrease in the maximum peak-valley price difference in 2025 H1, leading to significant revenue declines in Jiangsu [3]. - In the first half of 2025, China Electric Power Construction Group secured 20.9 billion yuan in new contracts for 96 new energy storage projects, with over 13 GWh of orders in June alone [4].
0.97~1.0元/Wh!河北200MW/800MWh独立储能电站EPC中标候选人公示