800MW/3.2GWh!内蒙古能源独立储能项目招标

Core Viewpoint - Inner Mongolia is entering a golden period for investment and construction in the energy storage market, with multiple GWh-level energy storage projects being initiated this year [3]. Group 1: Project Announcements - The Inner Mongolia Energy Tucheng Independent New Energy Storage Power Station project and the Inner Mongolia Energy Sunite Right Banner 300,000 kW/1,200 MWh independent energy storage project have announced a total procurement tender for energy storage system equipment, amounting to 800 MW/3.2 GWh [2][3]. - The Tucheng energy storage project has a planned total scale of 500 MW/2,000 MWh, utilizing lithium iron phosphate battery storage systems [2][10]. - The Sunite Right Banner energy storage project has a total scale of 300 MW/1,200 MWh, also employing lithium iron phosphate batteries [2][16]. Group 2: Tender Details - Bidders can participate in both tender sections but can only win one section [3][8]. - The tender for the Tucheng project is being organized by Inner Mongolia Tucheng County Mengneng Smart Energy Storage New Energy Co., Ltd., with project funding sourced from 20% self-financing and 80% bank loans [6][7]. - The tender for the Sunite Right Banner project is managed by Inner Mongolia Energy Group Sunite Right Banner Energy Storage New Energy Co., Ltd., with funding already secured [7][16]. Group 3: Project Specifications - The Tucheng project includes the construction of a new 220 kV booster station, which will connect to the Pingchuan 500 kV substation [10]. - The procurement scope includes manufacturing, pre-delivery testing, packaging, transportation, and on-site delivery of energy storage system equipment [10][17]. - The energy storage system will utilize a 1500V design scheme, with a grid connection voltage level of 35 kV [12][18]. Group 4: Delivery and Timeline - The delivery period for both projects starts on September 30, 2025, with all equipment to be delivered by October 30, 2025 [15][21]. - The delivery must be continuous and balanced to meet the construction progress requirements [15][21]. Group 5: Bidder Qualifications - Bidders must be legally registered independent entities in China with the ability to independently assume civil responsibilities [23]. - Bidders must have the capability to develop and manufacture at least one core product of the electrochemical energy storage system [25]. - Joint bids are not allowed, and agents are also prohibited from participating in the tender [26][27].

800MW/3.2GWh!内蒙古能源独立储能项目招标 - Reportify