Core Viewpoint - Shanxi has successfully implemented large-scale deployment of new energy storage and virtual power plants, demonstrating a significant adjustment capacity of 225,000 kilowatts during peak electricity demand periods [2][4]. Group 1: Energy Storage and Virtual Power Plants - On August 1, during peak electricity demand, Shanxi coordinated 47 energy storage stations and 16 virtual power plants, achieving a maximum power adjustment of 225,000 kilowatts, with new energy storage contributing 141,000 kilowatts and virtual power plants 84,000 kilowatts, accounting for 6% of real-time electricity load [2][3]. - The maximum fluctuation of new energy output reached 2,626,000 kilowatts, which is 57% of the operational capacity of thermal power units, indicating the increasing difficulty of relying solely on traditional power sources for grid stability [4]. Group 2: Operational Strategy and Future Plans - The operation focused on three core aspects: real scenarios, scientific scheduling, and safeguarding rights, with precise selection of periods when new energy output was low and electricity demand was high to simulate real grid balancing challenges [3][5]. - The next steps include deepening the collaborative scheduling mechanism for adjustment resources, optimizing processes and technical support, and improving market rules to fully activate the adjustment potential of "energy storage + virtual power plants" [5].
2.25GW!山西首次大规模新型储能和虚拟电厂集中调用
中关村储能产业技术联盟·2025-08-07 09:20