Core Viewpoint - The Dashi Gorge Water Conservancy Project in Xinjiang has officially entered the water storage phase, marking a significant milestone in its construction and operational readiness [1][3]. Group 1: Project Overview - The Dashi Gorge Water Conservancy Project is located in the Aksu region of Xinjiang and features the world's highest concrete-faced rockfill dam, with a maximum height of 247 meters, equivalent to over 80 stories [3]. - The dam's construction involved a total fill volume of 1,890,000 cubic meters, which could fill over 7,000 standard swimming pools [3]. - The project plans to install three 250,000-kilowatt turbine generator sets, with a total installed capacity of 750,000 kilowatts [3]. Group 2: Economic and Environmental Impact - Once completed, the project is expected to generate over 1.8 billion kilowatt-hours of clean electricity annually, sufficient to meet the annual electricity needs of 65,000 households [5]. - The project will provide a stable water source for agricultural irrigation in the Aksu region, which is crucial for the production of crops such as paper-shelled walnuts, apples, and jujubes [5]. - The project will also contribute 3.42 billion cubic meters of ecological water to the Tarim River annually, improving the ecological environment of the river basin and alleviating water shortages in over 8 million acres of downstream irrigation areas [5]. Group 3: Project Timeline - The Dashi Gorge Water Conservancy Project commenced construction in November 2019, with the dam expected to be completed by December 2024 and full operation planned for 2026 [5].
世界最高,下闸蓄水!
中国能源报·2025-09-20 08:15