Core Viewpoint - The article outlines the "Three-Year Doubling Action Plan for Electric Vehicle Charging Facilities Service Capacity (2025-2027)" aimed at enhancing the charging infrastructure to boost electric vehicle adoption and improve consumer confidence [2][4]. Group 1: Main Goals - By the end of 2027, the plan aims to establish 28 million charging facilities nationwide, providing over 300 million kilowatts of public charging capacity to meet the charging needs of more than 80 million electric vehicles, effectively doubling the current service capacity [4]. Group 2: Public Charging Facility Quality Upgrade Actions - Strengthening urban fast charging networks by constructing 1.6 million new direct current charging guns, including 100,000 high-power charging guns by the end of 2027 [5]. - Accelerating the renovation of charging facilities in highway service areas, with plans to build 40,000 "super-fast combined" charging guns of 60 kilowatts or more by the end of 2027 [5]. Group 3: Rural Charging Facility Development - Expanding charging network coverage in rural areas by adding at least 14,000 direct current charging guns in townships without public charging stations by the end of 2027 [6]. Group 4: Residential Charging Condition Optimization - New residential areas are required to build or reserve charging facilities for all fixed parking spaces, while existing areas will enhance charging facilities based on local conditions [7]. - Promoting a "unified construction and service" model for residential charging facilities to ensure sustainable management and operation [7]. Group 5: Vehicle-Grid Interaction Application Promotion - Expanding vehicle-grid interaction pilot projects, aiming to add over 5,000 bidirectional charging and discharging (V2G) facilities and achieve a reverse discharge volume exceeding 20 million kilowatt-hours by the end of 2027 [8]. Group 6: Power Supply Capacity and Service Improvement Actions - Upgrading distribution networks to accommodate charging facility demands, focusing on urban core areas, highway service areas, and old residential communities [9]. - Enhancing the efficiency of electricity connection services for electric vehicle charging facilities through simplified application processes and improved service channels [9]. Group 7: Charging Operation Service Quality Enhancement - Improving the quality and efficiency of public charging stations by upgrading old equipment and optimizing user experience through better service standards [10]. Group 8: Implementation Assurance Mechanisms - Strengthening organizational leadership to ensure the effective implementation of the action plan, with various departments responsible for different aspects of charging facility development [11][12]. - Promoting safety management and compliance with national standards in the construction and operation of charging facilities [12]. Group 9: Publicity and Guidance - Increasing policy publicity through various media channels to create a favorable environment for electric vehicle consumption and the upgrade of charging infrastructure [13].
关于印发《电动汽车充电设施服务能力“三年倍增”行动方案(2025—2027年)》的通知
国家能源局·2025-10-15 09:55