Core Viewpoint - The successful impoundment of the Dadu River Jinchuan Hydropower Station marks a significant step towards its commissioning, with the potential to replace approximately one million tons of coal consumption annually, contributing to a reduction in carbon emissions and optimization of China's energy structure [1][5]. Group 1: Project Overview - The Jinchuan Hydropower Station, located in Aba Prefecture, Sichuan Province, is the sixth hydropower station in the Dadu River's 28-level planning scheme, with a total installed capacity of 860 megawatts [1]. - The construction faced significant challenges due to complex geological conditions, being the highest rockfill dam in a deep cover area in China, with a construction difficulty level considered the highest domestically [1]. Group 2: Environmental and Technological Innovations - The project includes Asia's longest ecological fishway, designed to protect migratory fish species in the Dadu River, demonstrating a commitment to ecological preservation [3]. - The Jinchuan Hydropower Station has established China's first fully domestic three-dimensional digital modeling standard system for hydropower projects, enhancing geological analysis, construction simulation, and safety management [3]. Group 3: Economic and Environmental Impact - Upon completion, the Jinchuan Hydropower Station is expected to generate an average annual electricity output of approximately 3.5 billion kilowatt-hours, significantly contributing to reducing carbon emissions by about one million tons per year [5].
金川水电站成功下闸蓄水
中国能源报·2025-10-21 01:46