Core Viewpoint - Xiamen Haicheng Energy Storage Technology Co., Ltd. has signed a strategic cooperation agreement with El-Mor Renewable Energy, one of Israel's largest EPC contractors, to deploy a long-duration energy storage system project totaling 1.5GWh in Israel [1][2]. Group 1: Project Details - The collaboration involves the use of Haicheng's self-developed ∞Power 6.25MWh 4h energy storage system, with El-Mor responsible for designing and constructing the energy storage systems and related infrastructure [2][3]. - The total scale of the project is 300MW/1.5GWh, including a landmark facility in RAMAT BEKA, which will be the largest photovoltaic + battery storage system project in the region [3]. Group 2: Market Position and Orders - This project marks Haicheng's first significant overseas deployment of its long-duration energy storage solutions, with the company having secured multiple orders, totaling over 25GWh in Europe by the second half of 2025, of which 70% are long-duration storage projects [6]. - As of 2025, Haicheng's cumulative total order scale exceeds 44.5GWh [7]. Group 3: Industry Context - The energy storage industry is at a critical technological iteration point, with long-duration storage becoming essential for grid stability as renewable energy generation increases [7]. - It is widely recognized that when renewable energy generation exceeds 20%, long-duration storage of over 4 hours becomes a necessity, and when it reaches 50%-80%, storage duration needs to extend beyond 10 hours [7]. Group 4: Technological Advancements - Haicheng has proactively positioned itself in the long-duration lithium battery storage sector since 2022, launching the world's first long-duration storage-specific battery with a capacity of 1175Ah [7]. - The company has developed core technologies for long-duration storage, covering the entire supply chain from materials to battery cells and systems, becoming the first globally to achieve mass production of large cells for long-duration lithium battery storage [7]. Group 5: Manufacturing Capacity - Haicheng has invested over 13 billion yuan to establish the world's first zero-carbon long-duration energy storage industrial park in Heze, Shandong, with an annual production capacity of 30GWh for energy storage batteries and 20GWh for energy storage systems [8]. - The facility will utilize Haicheng's fifth-generation intelligent production line, with a single line capacity exceeding 10GWh, providing strong support for the development of long-duration energy storage [8].
1.5GWh!海辰储能再签重要订单
行家说储能·2025-11-07 10:36