放电量补偿0.28元/kWh!内蒙古发布规范独立新型储能管理有关事宜的通知

Core Viewpoint - The Inner Mongolia Energy Bureau has issued a notification regarding the management of independent new energy storage power stations, establishing compensation standards and regulatory measures to promote high-quality development in this sector [2][5]. Summary by Sections Compensation Standards - The compensation standard for the discharge of electricity from independent new energy storage power stations to the public grid for the year 2026 is set at 0.28 yuan per kilowatt-hour [2][5]. - For the year 2025, the compensation standard is 0.35 yuan per kilowatt-hour, with a stipulation that projects not commenced by June 30, 2025, will not be eligible for this standard [2][5]. Project Management and Compliance - Independent new energy storage power stations must not change their construction content or ownership structure through means such as proxy holding or hidden shareholders during the construction period and for two years post-completion [3][7]. - Any changes in shareholder ratios, investment entities, or actual controllers must be reported immediately, and projects may be removed from the construction list if such changes occur [3][7]. Operational Guidelines - Storage power stations are required to play a regulatory role in the power system, refraining from discharging electricity during periods of difficulty in renewable energy consumption and from charging during power supply shortages [6]. - The grid companies are mandated to publish daily power supply and demand forecasts and to verify the charging and discharging curves of the storage stations [6]. Regulatory Oversight - Regular supervision will be conducted by local energy authorities in collaboration with grid companies to ensure compliance with the established guidelines [7]. - By January 31 each year, local energy authorities must report the actual control situation of the storage stations to the Inner Mongolia Energy Bureau [7].