Core Viewpoint - The successful commissioning of the Zhangye Power Plant's 3rd unit marks a significant advancement in the development of the Hexi Corridor energy base, enhancing the region's clean energy capabilities and supporting the transition to a low-carbon energy system [1][3]. Group 1: Project Details - The Zhangye Power Plant's expansion includes two 1000 MW ultra-supercritical coal-fired units, which are designed to provide stable power supply, clean heating, and peak load regulation [3]. - The project has achieved a coal consumption rate of 281.101 grams per kilowatt-hour, a plant use electricity rate of 4.275%, and a water consumption of 0.054 cubic meters per gigawatt-second [3]. Group 2: Environmental Impact - The project features advanced indirect air cooling systems and a comprehensive wastewater treatment system, achieving zero evaporation of cooling water, zero discharge of rainwater, and zero wastewater discharge [3]. - The plant also aims for zero fuel consumption and near-zero emissions of flue gas, setting a new benchmark for green power plants [3]. Group 3: Regional Benefits - The commissioning of the project is expected to significantly meet the growing load demand in Gansu Province, enhancing the safety and stability of the Hexi power grid and its peak load regulation capabilities [3]. - The project supports the development and consumption of wind and solar energy in the Hexi Corridor, contributing to the region's green and low-carbon energy transition [3].
又一百万机组投产!