4.75GWh!全球最大钠电池储能订单落地!
DT新材料·2025-11-27 16:05

Core Insights - Peak Energy has signed a significant multi-year agreement with Jupiter Power to supply up to 4.75 GWh of sodium-ion battery energy storage systems (ESS), with the first phase delivering approximately 720 MWh by 2027, potentially exceeding $500 million in total contract value [1][2] Group 1: Agreement Details - The contract represents the largest sodium-ion battery deployment project announced to date, with additional capacity reservation options for 4 GWh systems from 2028 to 2030 [1] - Jupiter Power was selected based on Peak's proprietary sodium-ion (NFPP) system's operational and financial metrics, which were recently launched [1] Group 2: Technology Features - The sodium-ion system features a fully passive design that eliminates the need for active cooling systems, reducing auxiliary power usage by up to 97% and enhancing safety [2] - Compared to existing lithium-ion battery alternatives, the system boasts a nearly 30% improvement in battery degradation performance over a 20-year lifespan, potentially reducing or eliminating future expansion needs [2] Group 3: Industry Context - Peak Energy focuses on developing gigawatt-level energy storage technologies, while Jupiter Power is a well-known developer and operator of utility-scale battery storage systems [2]