两座百万千瓦光伏电站同步投产!
中国能源报·2026-01-01 09:59

Core Viewpoint - The simultaneous commissioning of two 1 million kilowatt photovoltaic power stations in the Yalong River Basin marks a significant advancement in the integrated development of water, wind, and solar energy in the region [1][3]. Group 1: Project Details - The Yalong River Suorong Photovoltaic Power Station and the Chaburang Photovoltaic Power Station, each with an installed capacity of 1 million kilowatts, are set to begin operations by December 31, 2025 [3]. - The Suorong Photovoltaic Power Station is located in Litang County, Garze Tibetan Autonomous Prefecture, Sichuan Province, while the Chaburang Photovoltaic Power Station is situated in Muli County, Liangshan Yi Autonomous Prefecture, Sichuan Province [5]. Group 2: Environmental Impact - The two photovoltaic power stations are expected to generate approximately 3.9 billion kilowatt-hours of clean electricity annually, which will save about 1.2 million tons of standard coal and reduce carbon dioxide emissions by approximately 3.1 million tons each year [7]. - With the commissioning of these two power stations, the Yalong River Basin's integrated water and solar energy base has nearly 23 million kilowatts of clean energy capacity in operation and about 12 million kilowatts under construction [7].

两座百万千瓦光伏电站同步投产! - Reportify