签约3GWh!晶科储能与陕西亿禾绿动达成深度合作

Group 1 - Jinko Energy and Shaanxi Yihe Green Energy have signed a framework cooperation agreement to develop energy storage projects with a target scale of 3GWh over the next two years [2] - Jinko Storage will provide its next-generation Blue Whale SunTera G3 6.25MWh battery storage system, which features a 95% system cycle efficiency and a lifespan of up to 10,000 cycles, ensuring long-term economic viability [4] - The system incorporates intelligent liquid cooling technology and non-uniform flow channel design, achieving precise temperature control with a temperature difference of ≤2°C between cells, enhancing operational safety and lifespan [4] Group 2 - Jinko Storage will participate in the 14th International Energy Storage Summit and Exhibition (ESIE 2026) scheduled for March 31 to April 3, 2026, in Beijing [5][6] - The event is positioned as a barometer for the development of the energy storage industry in China [5]