500MW/2GWh!中国绿发新疆首个储能项目成功并网

Core Viewpoint - The successful integration of the first device in the Xinjiang Green Power's 500,000 kW/200 MWh energy storage project marks a significant step in China's energy storage layout in Xinjiang, providing crucial support for the energy storage system in southern Xinjiang [2][4]. Group 1: Project Overview - The Xinjiang Green Power's energy storage project is located in Ruoqiang County, Bayingolin Mongol Autonomous Prefecture, approximately 18.3 kilometers from the county seat, covering an area of 141.88 acres [4]. - The project includes the construction of a 220 kV energy storage booster station and a new 1.429-kilometer transmission line connecting to the 220 kV Ruoqiang South photovoltaic gathering station [4]. - This project is the first energy storage initiative by Xinjiang Green Power and is a key component of the region's new energy storage engineering efforts, aligning with China's dual carbon goals and supporting high-quality energy development in southern Xinjiang [4]. Group 2: Project Benefits - Upon operation, the project will create a synergistic effect with photovoltaic projects, serving as a "super battery" to provide three integrated services: peak shaving, frequency modulation, and backup capacity, significantly enhancing the flexibility and operational stability of the southern Xinjiang power grid [4]. - The project aims to greatly improve the absorption capacity of renewable energy sources, such as solar power, in the region [4]. Group 3: Industry Events - Xinjiang Green Power has confirmed participation in the 14th International Energy Storage Summit and Exhibition (ESIE 2026), inviting industry peers to join the global energy storage industry event [5]. - The event is scheduled to take place from March 31 to April 3, 2026, at the Capital International Exhibition Center in Beijing [5].

500MW/2GWh!中国绿发新疆首个储能项目成功并网 - Reportify