Core Viewpoint - The Ningxia Hui Autonomous Region's Wuzhong City Li Tong District Development and Reform Bureau announced the cancellation of several energy storage projects due to overdue permits and abandonment by investors, totaling an investment of 5.43 billion yuan and a storage capacity of 1.225 GW/2.67 GWh [3][6]. Group 1: Project Cancellations - A total of 9 energy storage projects were canceled, including 7 with overdue permits and 2 where investment entities abandoned construction [6]. - The canceled projects are distributed across various locations in Li Tong District, including Sunjiatan, Dongta, Biandangu, and Banjiao Township [3]. - The largest project was a 300 MW/600 MWh regional shared energy storage station by Jiahua (Wuzhong) New Energy Co., Ltd., with an investment of 1.17 billion yuan [3][8]. Group 2: Investment and Technology - The total investment for the canceled projects reached 5.43 billion yuan, with a total storage capacity of 1.225 GW and 2.67 GWh [3]. - The technology types involved in these projects included lithium batteries, all-vanadium flow batteries, and lead-carbon batteries [3]. - The highest investment project was the 100 MW/400 MWh shared energy storage project by Wuzhong Lihe Vanadium Storage New Energy Co., Ltd., with a total investment of 1.5 billion yuan, utilizing an all-vanadium flow battery storage system [3][8].
1.225GW/2.67GWh!宁夏9个储能项目废止
中关村储能产业技术联盟·2026-02-05 10:45