Core Viewpoint - The "Yin-Da Ji-Huang" project, the largest inter-basin water diversion project in the upper reaches of the Yellow River, has supplied 185 million cubic meters of water in its first six months of operation, demonstrating significant benefits for irrigation and ecological restoration [1][2]. Group 1 - The project has provided 76 million cubic meters of ecological water replenishment, benefiting the main stream of the Huangshui River [1]. - The Huangshui River basin, which accounts for 65% of Qinghai's population and 71% of its arable land, faces a severe water resource mismatch, with only 3.4% of the province's water resources available [1]. - The total investment in the project is 14.634 billion RMB, with an annual water supply capacity of 526 million cubic meters and a controlled irrigation area of 1,004,900 acres [1]. Group 2 - The project supports irrigation for one million acres of agriculture and forestry, as well as two industrial clusters worth over 100 billion RMB each, benefiting approximately 3 million people [2]. - Advanced technologies such as digitalization, networking, and intelligence have been integrated into the project, creating a modern water management model characterized by precise scheduling and comprehensive perception [2].
投运半年,累计供水1.85亿立方米
中国能源报·2026-02-10 10:52