Core Viewpoint - The article discusses the public announcement of the candidates for the 2026 annual energy storage system framework procurement by China General Nuclear Power Group (CGN) [3]. Group 1: Procurement Details - The procurement involves six segments, each with a capacity of 1.2 GWh, totaling 7.2 GWh [4]. - The bidding price range for the six segments is between 0.491 yuan/Wh and 0.52995 yuan/Wh [5]. - The first candidates for each segment and their respective prices are as follows: - Segment 1: Envision Energy Co., Ltd. at 0.495 yuan/Wh - Segment 2: BYD Auto Industry Co., Ltd. at 0.507 yuan/Wh - Segment 3: CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd. at 0.491 yuan/Wh - Segment 4: Nanjing NARI Group at 0.52995 yuan/Wh - Segment 5: Beijing Tiancheng Tongchuang Electric Co., Ltd. at 0.52265 yuan/Wh - Segment 6: Shenzhen Kelu Electronics Technology Co., Ltd. at 0.515 yuan/Wh [5][6]. Group 2: Bidder Requirements - Bidders must participate in all six segments and cannot have different quotes for the same model and technical requirements across different segments; otherwise, their bids will be disqualified [7]. - Bidders must meet performance requirements for both grid-connected and off-grid energy storage equipment [8]. - Specific performance requirements include: - For off-grid equipment: at least 50 MWh operational performance over the last three years, with battery units having at least 500 MWh operational performance, and energy storage inverters with at least 20 MW operational performance. - For grid-connected equipment: at least 1 GWh operational performance over the last three years, with at least one project having 200 MWh operational performance, and similar battery and inverter requirements as above [9]. Group 3: Contract Validity - The framework contract is valid from January 2026 to January 2027 [10].
7.2GWh中广核储能系统集采中标候选人公示:远景能源/比亚迪/中车株洲所/南瑞继保/天诚同创/科陆电子分列第一,报价0.49-0.53元/Wh