Core Viewpoint - Zhejiang Petrochemical Co., Ltd. is advancing its integrated refining and chemical project, marking a significant step in the "reduce oil and increase chemicals" strategy, with a focus on self-sufficient technology across the entire industrial chain [2][3]. Group 1: Project Overview - The project includes the construction of key facilities such as a 400,000 tons/year POE polyolefin elastomer unit and a 700,000 tons/year LDPE/EVA unit, which are pivotal for the refining industry's transformation [2]. - The project is located in the Zhoushan Green Petrochemical Base and involves the establishment of multiple new production units, including a continuous reforming unit and various separation units [2][4]. Group 2: Production Capacity and Strategy - After the project completion, the crude oil processing capacity will remain at 40 million tons/year, with PX capacity at 8.8 million tons/year and ethylene capacity at 4.2 million tons/year, indicating stability in existing operations [3]. - The project aims to extend the downstream chemical industry chain by utilizing surplus products like benzene and acetone to develop high-end chemical and new material products, facilitating a structural adjustment towards high-value offerings [3]. Group 3: Technological Advancements - The project emphasizes the development of a complete technological system from basic raw materials to high-end polyolefins, addressing the domestic technological gap in high-end materials production [2]. - The integration of self-developed α-olefin and tubular LDPE/EVA processes is central to this technological advancement, aligning with the material needs of industries such as photovoltaics and new energy vehicles [2].
40万吨/年POE、70万吨/年LDPE/EVA项目公示
DT新材料·2026-02-20 11:59