Workflow
Sigma Lithium Corp.
icon
Search documents
Lithium Ionic Announces Closing of Final Tranche of Oversubscribed Non-Brokered Private Placement
Globenewswire· 2025-10-03 11:00
Core Points - Lithium Ionic Corp. has successfully closed the second tranche of its non-brokered private placement financing, raising a total of $18,263,091 from the issuance of 26,090,130 units at a price of $0.70 per unit [1][2] - The proceeds from the offering will be utilized for the development of the company's Brazilian properties and for general corporate purposes [2] Financing Details - The second tranche consisted of 7,739,989 units, generating gross proceeds of $5,417,992 [1] - Each unit includes one common share and one common share purchase warrant, with the warrant allowing the purchase of one common share at an exercise price of $0.90 for 24 months [2] Insider Participation - Certain insiders acquired 947,929 units in the second tranche, which is classified as a related party transaction [4] - This insider participation is exempt from formal valuation and minority shareholder approval requirements as it does not exceed 25% of the company's market capitalization [4] Regulatory Compliance - The securities issued are subject to a four-month hold period under applicable securities laws and require approval from the TSX Venture Exchange [3] Company Overview - Lithium Ionic Corp. is a Canadian mining company focused on exploring and developing lithium properties in Brazil, particularly in the northeastern part of Minas Gerais state [7] - The company's flagship projects, Itinga and Salinas, cover 14,668 hectares in a region recognized as a world-class hard-rock lithium district [7]
Lithium Ionic Announces Definitive Feasibility Study Results for Bandeira Lithium Project, Minas Gerais, Brazil
Globenewswire· 2025-09-17 11:00
Core Insights - The updated Feasibility Study for the Bandeira Lithium Project demonstrates a longer mine life, lower capital costs, and stronger project economics, positioning it as one of the lowest-cost hard rock spodumene projects globally [1][10][35] Project Economics - Post-tax NPV at 8% is improved to US$1.45 billion from US$1.31 billion in the previous study, with a post-tax IRR increasing to 61% from 40% [6][32] - The payback period has been reduced to 2.2 years from 3.4 years, indicating a quicker return on investment [6][32] - Average annual gross revenue over the life of the mine is projected at US$343 million, down from US$417 million in the prior study [6][32] Capital and Operating Costs - Initial capital expenditures (CAPEX) have been reduced by approximately 28% to US$191 million from US$266 million [6][27] - Site operating costs are estimated at US$378 per tonne of spodumene concentrate produced, which is competitive within the global lithium industry [6][29] Mine Life and Production - The mine life has been extended to 18.5 years from 14 years, supported by a 6 million tonne increase in proven and probable reserves [6][11] - Total life-of-mine production is projected at 23.2 million tonnes, with an average annual production rate of 177,000 tonnes of spodumene concentrate [6][38] Environmental and Operational Design - The project incorporates responsible environmental design, including a long-term underground mining strategy to minimize land disturbance and water consumption [9][10] - The processing plant design utilizes proven technology and modular components to reduce costs and enhance operational efficiency [9][23] Infrastructure and Location - The Bandeira property is located in Brazil's Lithium Valley, an area known for its high-quality spodumene concentrate production [1][14] - The project benefits from excellent local infrastructure, including proximity to major highways and a key logistical port for exporting lithium concentrate [15][16] Regulatory and Permitting Status - The project is advancing through the permitting process, with a positive technical endorsement received from the Minas Gerais State Secretariat for the Environment [42][43] - Ongoing engagement with regulatory agencies and community stakeholders is aimed at ensuring compliance and addressing evolving expectations [43][44]
Lithium Ionic Files NI 43-101 Technical Report for the Bandeira Mineral Resource Estimate, Minas Gerais, Brazil
Globenewswire· 2025-06-09 16:33
Core Viewpoint - Lithium Ionic Corp. has filed an independent NI 43-101 compliant technical report for its 100%-owned Bandeira Lithium Project in Brazil, which includes an updated Mineral Resource Estimate (MRE) announced on May 6, 2025 [1][3]. Group 1: Technical Report and Mineral Resource Estimate - The technical report, titled "Bandeira Lithium Project NI 43-101 Technical Report Mineral Resource Update," was prepared by GE21 Consultoria Mineral Ltda., AtkinsRéalis, L&M Advisory, and Planminas, with an effective date of November 20, 2024 [2]. - The updated MRE includes Measured and Indicated resources of 27.27 million tonnes (Mt) grading 1.34% Li₂O, equating to 901,059 tonnes of lithium carbonate equivalent (LCE), and an additional 18.55 Mt in the Inferred category also grading 1.34% Li₂O, which corresponds to 615,432 tonnes LCE [3]. - The updated MRE increases the Company's consolidated global mineral resources to 36.76 Mt grading 1.31% Li₂O in the Measured and Indicated category, alongside 31.87 Mt grading 1.19% Li₂O in the Inferred category [4]. Group 2: Project Overview and Location - The Bandeira Project covers 158 hectares, representing less than 1% of Lithium Ionic's total 17,000-hectare land position, and is considered one of the most promising lithium development-stage assets in Brazil [5]. - The project is strategically located adjacent to Sigma Lithium's Grota do Cirilo and Barreiro projects, as well as Companhia Brasileira de Lítio's long-standing underground lithium operation [5][8]. Group 3: Future Developments - An updated Feasibility Study to integrate the expanded MRE is currently underway and is expected to be completed in the second half of 2025 [3].