Workflow
Electric vehicle charging
icon
Search documents
Blink Charging Names Michael Bercovich Chief Financial Officer
Globenewswire· 2025-06-05 12:00
Core Insights - Blink Charging Co. has appointed Michael Bercovich as the new Chief Financial Officer, effective June 23, 2025, following the departure of previous CFO Michael Rama [1][4]. Company Overview - Blink Charging is a leading global provider of electric vehicle (EV) charging equipment and services, facilitating the transition to electric transportation through innovative solutions [6]. Leadership Background - Michael Bercovich has over 20 years of diverse experience in finance leadership roles across various tech companies, having previously served as CFO at multiple organizations and successfully raised over $250 million in capital [2][3]. - Bercovich's career includes significant roles at KPMG and leading financial operations for Xerox and CGI Group, showcasing his ability to navigate complex regulatory environments and drive business growth [3]. Transition and Continuity - Robert Strauss, a senior advisor from FTI Consulting, will serve as Interim CFO until Bercovich officially joins, ensuring operational continuity during the transition [4]. - The previous CFO, Michael Rama, contributed to strengthening Blink's financial foundation and supporting strategic initiatives before pursuing new opportunities [5]. Future Outlook - Bercovich expressed enthusiasm about joining Blink at a pivotal time, aiming to enhance the company's success in introducing new EV charging and energy management solutions, which are expected to positively impact revenue and market presence [5].
理想超充站2304座|截至25年5月19日
理想TOP2· 2025-05-19 13:18
来源: 北北自律机 5C监工机:25年05月19日星期一 理想超充 2 新增。 超充建成数:2302→2304座 基于2025年底4000+座目标 今年新增数进度值:25.30%→25.38% 今年剩余226天 今年时间进度值:38.08% 需每日 7.50 座,达到年底目标值 【附】2 座新增建成 加微信,进群深度交流理想长期基本面。不是车友群。 基于i8发布日期 2500+座目标 新增数进度值:74.39%→74.64% i8发布剩余73天(按7月31假设) i8发布剩余时间进度值:65.40% 需每日 2.68 座,达到 i8发布 目标值 ———————————————————— 福建省泉州市 泉州鲤城奇顺停车场 为城市4C站,规格:4C × 6 广东省广州市 广州力达广场 为城市4C站,规格:4C × 6 ...
Blink Charging to Host First Quarter Conference Call on Monday, May 12, 2025
Globenewswire· 2025-04-30 14:30
Bowie, MD, April 30, 2025 (GLOBE NEWSWIRE) -- Blink Charging Co. (NASDAQ: BLNK) (“Blink” or the “Company”), a leading global manufacturer, owner, operator, and provider of electric vehicle (EV) charging equipment and services, will announce its first quarter results on Monday, May 12, 2025, following the close of the financial markets. The Company will host a conference call and webcast that day at 4:30 p.m. Eastern Time to discuss the Company’s results for the first quarter ended March 31, 2025. To access ...
New PG&E Service Offering Makes It Easier and Faster to Connect EV Chargers, EV Fleets and Big Batteries to the Grid
Prnewswire· 2025-04-28 17:10
Core Insights - PG&E has introduced the Flexible Service Connection (Flex Connect) to expedite the connection of EV charging stations and grid-scale batteries without waiting for infrastructure upgrades [2][4][10] - The Flex Connect system utilizes a cloud-based Distributed Energy Resource Management System (DERMS) to manage power demand and supply dynamically, allowing for quicker connections [3][5] - The initiative has already enabled significant capacity increases for companies like Tesla and PepsiCo, enhancing their electric vehicle operations [7][9][11] Group 1: Flexible Service Connection Overview - Flex Connect allows customers with controllable power needs, such as EV chargers, to connect to the grid without waiting for capacity upgrades [2][4] - The system coordinates power demand based on electricity supply availability, allowing for immediate connections while long-term upgrades are completed [3][5] - PG&E has successfully expedited connections for four sites through Flex Connect, with more in development [4] Group 2: Impact on Tesla and PepsiCo - Tesla has utilized Flex Connect to increase the capacity of new Supercharger sites, allowing for immediate access to 2 megawatts (MW) of power, with adjustments during peak times [6][7] - PepsiCo's facility in Fresno has increased its electric semi-truck fleet charging capabilities from 30 to 50 trucks, receiving up to 4.5 MW of capacity most of the time [8][9] - The early access to additional power through Flex Connect has enabled PepsiCo to reduce CO2 emissions by approximately 8,000 tons and save around $1 million in fuel costs [11] Group 3: Future Plans and Additional Services - PG&E is expanding its DERMS capabilities to include more load management programs and plans to operationalize additional battery energy storage systems [16][17] - The company is also supporting the expansion of electric mobility infrastructure, including new Revel EV chargers in California [14] - PG&E's EV Fleet program and new EV Fleet Advisory Services aim to assist commercial customers in transitioning to electric vehicles [12][13]
理想超充站2129座|截至25年4月25日
理想TOP2· 2025-04-25 12:43
来源: 北北自律机 318已建成:7座 318建成进度值:43.75% 4月30日 剩余5天 4月30日 时间进度值:95.83% (提示:建设进度落后于时间进度) 需每日 1.80 座,达到 4月底 16座 318超充站 目标值 ———————————————————— 基于i8发布日期 2500+座目标 25年04月25日星期五 理想超充 1 新增。 超充建成数:2128→2129座 基于 4月30日 16座 318川藏超充站 目标 今年剩余250天 今年时间进度值:31.51% 需每日 7.48 座,达到年底目标值 【附】1 座新增建成 新增数进度值:51.88%→52.01% i8发布剩余97天(按7月31假设) i8发布剩余时间进度值:54.03% (提示:建设进度落后于时间进度) 需每日 3.82 座,达到 i8发布 目标值 基于2025年底4000+座目标 今年新增数进度值:17.64%→17.69% 江苏省 无锡市 江阴五洲国际 为城市4C站,规格:4C × 6 加微信,进群深度交流理想长期基本面。不是车友群。 ...