Workflow
Gold Mineralization
icon
Search documents
Radisson Step-Out Drilling at O'Brien Gold Project Intersects High-Grade Mineralization in Multiple Locations
Newsfile· 2025-10-28 10:30
Core Insights - Radisson Mining Resources Inc. announced assay results from fifteen new drill holes at its 100%-owned O'Brien Gold Project, indicating high-grade gold mineralization across multiple locations [1][2][30] - The ongoing drill program consists of 140,000 metres aimed at expanding the understanding of gold mineralization at the project [1][14] Summary by Sections Drill Results - Significant intercepts were reported in three separate step-out locations, including: - Between Trends 1 and 2 at 1,000 metres vertical depth - Beneath the historic "O'Brien Mine West" at 1,000 metres vertical depth - Beneath the historic "O'Brien Mine" at 1,100 metres vertical depth [2][17] - Notable drill hole results include: - OB-24-337W11: 7.00 g/t Au over 3.0 metres, including 12.60 g/t Au over 1.5 metres [2][15] - OB-25-371W4: 11.25 g/t Au over 2.5 metres, including 17.80 g/t Au over 1.5 metres [4][16] - OB-25-376W1: 9.16 g/t Au over 2.5 metres, including 14.70 g/t Au over 1.1 metres [4][17] Geological Context - Gold mineralization at O'Brien is associated with quartz-sulphide veins within a band of interlayered volcanic rocks and conglomerates, typically found in contact with the Larder Lake-Cadillac Break [11][12] - The historic O'Brien mine produced over half a million ounces of gold at an average grade exceeding 15 g/t Au [13][30] Exploration Strategy - The step-out drilling program aims to test the extent of mineralization beneath the historic mine, utilizing pilot holes followed by wedges and directional drilling to enhance efficiency [14][15] - The company plans to increase the number of drill rigs from four to eight to expedite the ongoing exploration efforts [2][14] Future Outlook - The results from the recent drilling suggest continuity of high-grade mineralization and indicate potential for further resource growth at the O'Brien Gold Project [2][17] - The company is prioritizing the closure of gaps between mineralization trends through additional drilling [2][16]
North Bay Resources Announces Assays >2.9 Ounces per Ton Gold, Fran Gold Project, British Columbia
Globenewswire· 2025-10-27 13:00
BISHOP, Calif., Oct. 27, 2025 (GLOBE NEWSWIRE) -- North Bay Resources, Inc. (the “Company” or “North Bay”) (OTC: NBRI) is pleased to announce assays of 0.4 to >2.9 ounces per ton gold, Fran Gold Project, British Columbia. Four samples of ~5lbs each were taken from alternating supersacks, as part of a 20 ton test shipment, and assayed by ALS Global, North Vancouver, BC using fire assay method Au-AA25: Sample numberWeight lbs.Weight kg.Au Ounces per TonAu Grams per Tonne25FRTB-14.42.00.4114.025FRTB-47.83.52.6 ...
Onyx Gold Drills 1.5 g/t Gold over 99.5 Meters, Including 3.3 g/t Gold over 17 Meters; Further Expanding Gold Mineralization at Argus North
Newsfile· 2025-10-22 11:30
Core Insights - Onyx Gold Corp. has reported additional drill results from its ongoing 25,000 metre drill program at the Munro-Croesus Project, indicating significant expansion of gold mineralization at the Argus North Zone [2][4][5] Group 1: Drill Results - Recent drilling at Argus North has shown wide and consistent gold mineralization, with notable results including 99.5 meters grading 1.5 grams per tonne (g/t) Au, and 71.0 meters grading 1.3 g/t Au [6][14] - The number of intersections exceeding 100-gram x meters has increased to seven, demonstrating excellent continuity of mineralization [6][15] - The Argus North Zone remains open along strike, down-dip, and down-plunge, indicating further potential for expansion [15] Group 2: Geological Context - Gold mineralization at Argus North is characterized by broad zones of +1 g/t Au mineralization, with high-grade intercepts such as 17.0 meters grading 5.3 g/t Au and 18.7 meters grading 5.2 g/t Au [8][9] - The geological setting includes strong albitization and silicification, with mineralization closely associated with pyritic stringers and localized porphyritic intrusions [9][10] Group 3: Project Overview - The Munro-Croesus Project is located in the Abitibi greenstone belt, a premier gold mining jurisdiction in Canada, covering 109 km² of highly prospective geology [23][24] - The project includes the past-producing Croesus Gold Mine, known for high-grade gold production, and has seen extensive land consolidation to enhance exploration potential [23][25] Group 4: Future Plans - Onyx Gold has completed 70 drill holes, representing approximately 88% of its drill program, and is evaluating results to finalize plans for a potential program expansion [6][15] - Details regarding the potential expansion of the drilling program are expected to be announced in the coming weeks [6][15]
Ximen Mining Intersects 79.2 g/t Gold Over 0.55m - Visible Gold Confirms High-Grade Mineralization and Expands West Zone Potential at Brett Project, Vernon BC
Newsfile· 2025-10-21 13:00
Ximen Mining Intersects 79.2 g/t Gold Over 0.55m - Visible Gold Confirms High-Grade Mineralization and Expands West Zone Potential at Brett Project, Vernon BCOctober 21, 2025 9:00 AM EDT | Source: Ximen Mining Corp.Vancouver, British Columbia--(Newsfile Corp. - October 21, 2025) - Ximen Mining Corp. (TSXV: XIM) (FSE: 1XM) (OTC: XXMMF) (the "Company" or "Ximen") provides the following update on its Brett epithermal gold property, near Vernon in south-central B.C.The Company is pleased to report ...
GoldHaven Resources Advances Drilling with Second Hole Completed on Copeçal Gold Project
Globenewswire· 2025-10-21 13:00
VANCOUVER, British Columbia, Oct. 21, 2025 (GLOBE NEWSWIRE) -- GoldHaven Resources Corp. (CSE: GOH | OTCQB: GHVNF | Frankfurt: 4QS) (“GoldHaven” or the “Company”) is pleased to announce the successful completion of its second diamond drill hole (COP-002) at the East Target of its 100%-owned Copeçal Project, located in Mato Grosso State, Brazil. Highlights: Second diamond drill hole (COP-002) completed to a depth of 121 metres.Enhanced alteration and veining intensity observed relative to COP-001.Intersectio ...
NEVADA CANYON ANNOUNCES SIGNIFICANT GOLD INTERCEPTS INCLUDING 21.8 G/T AU OVER 4.6 METERS REPORTED AT THE LAPON CANYON GOLD PROJECT
Globenewswire· 2025-10-14 13:00
Core Insights - Nevada Canyon Gold Corp. announced additional drill results from the 2025 reverse circulation drill program at the Lapon Canyon Gold Project, confirming the extension of gold mineralization to the south and east of the Hotspot [1][2][3] Company Overview - Nevada Canyon Gold Corp. has a $5 million Exploration Stream Earn-in Agreement for 50% of the Lapon Canyon Gold Project, which is 100% owned by Walker River Resources [1][3] - The company holds a 3% Net Smelter Royalty on the project [1] Drilling Results - The drilling results indicate significant extensions of gold mineralization, with notable findings including: - 3.35 g/t Au over 64m starting at 149.4m in hole LC-25-150, including 8.01 g/t Au over 19.9m [5] - 2.17 g/t Au over 86.9m starting at 126.5m in hole LC-25-156, including 21.8 g/t Au over 4.6m [5] - 1.38 g/t Au over 68.6m starting at 97.5m in hole LC-25-154 [5] - The drill program is focused on resource definition and exploration of new areas, with drilling extending significantly to the south and east [3][4] Project Potential - The occurrence of mineralization in different host rocks suggests the potential for a significant resource at the Lapon Canyon Project [3] - Ongoing work includes data compilation, interpretation, and resource modeling, aiming to complete an initial NI 43-101 compliant mineral resource [8] Management Commentary - The President of Nevada Canyon expressed optimism regarding the drill results, indicating that the exploration spending is expected to create value for shareholders [3] - The Chairman and CEO highlighted the consistent and significant results from the Lapon Canyon Project, emphasizing the quality of Nevada-based royalties and streams [4]
Dryden Gold Discovers Broad Mineralized Gold System and Purchases Royalties at Sherridon
Newsfile· 2025-10-14 10:00
Core Insights - Dryden Gold Corp. has announced significant drill results from its exploration program at the Sherridon Project, indicating broad zones of anomalous gold mineralization [1][4] - The company has also acquired two net-smelter return royalties (NSRs) related to the Sherridon claims, enhancing its asset portfolio [2][11] Exploration Results - The initial three-hole drilling program at Sherridon intersected multiple broad zones of gold mineralization, with notable results including 1.28 g/t gold over 19.00 meters and 0.40 g/t gold over 39.00 meters [6][17] - A very extensive zone of anomalous gold mineralization of up to 136 meters was identified across all three drill holes [6] Geological Context - Sherridon is characterized by a unique geological setting, including ultramafic dykes and proximity to syn-tectonic granitic intrusions, which are believed to be potential sources of mineralizing fluids [12][13] - The mineralization style at Sherridon differs from that at the Gold Rock camp, suggesting a lower-grade bulk-tonnage target [1][4] Royalty Acquisition - The company completed the purchase of two 2% NSRs for CAN$20,000, which cover specific claims at Sherridon, enhancing property and shareholder value [2][11] Future Plans - The geology team is resampling historical core to better define the mineralized zones and is awaiting further geochemical results to understand the deposit model [4][12] - Upcoming presentations at various investment conferences will provide opportunities for management to engage with investors and discuss ongoing exploration efforts [14][15][16]
GoldHaven Resources Commences Inaugural Diamond Drilling Program at Copeçal Gold Project, Brazil
Globenewswire· 2025-10-09 13:00
Core Insights - GoldHaven Resources Corp. has commenced its inaugural diamond drilling program at the Copeçal Gold Project in Brazil, with the first drill hole targeting the East Zone approaching a depth of 100 metres [1][3] Geological Observations - Initial geological observations from the first drill hole are promising, intersecting approximately 30 metres of saprolite before entering sheared and hydrothermally altered basement gneiss, indicating a potential mineralized hydrothermal system at depth [2][4] - The alteration assemblage includes chlorite, sericite, and quartz, which are classic indicators of hydrothermal fluid activity associated with gold mineralization [3][4] Drilling Program Details - The total drilling program consists of 1,200 metres planned across 5-6 angled holes, targeting both East and West Zone areas, with individual holes reaching up to 150 metres in depth [3] - Core samples are being processed at ALS Global laboratories, with assay results expected in 4-6 weeks following the completion of drilling [3] Target Area Characteristics - The East Zone target area shows a strong gold and arsenic geochemical signature at the surface, with soil values exceeding 100 ppb gold over a 3-kilometre strike length [5] - This geochemical anomaly aligns with interpreted geological structures identified through VLF electromagnetic surveys, which are classic traps for gold deposition [5] Historical Context - The Copeçal Gold Project is located within the Alta Floresta Gold Province, a historically productive region for gold discoveries since the late 1970s, covering a total of 3,681 hectares [10] - The Juruena Gold Province is known for its potential for mesothermal shear-related and intrusion-related gold deposits, further supporting the significance of the Copeçal Gold Project [11] Previous Exploration Efforts - Prior exploration by AngloGold Ashanti from 2010 to 2016 included systematic exploration methods that identified multiple zones of anomalous gold mineralization [12][13] - Historical work has confirmed gold and arsenic anomalies, indicating significant mineralization potential within the project area [13]
Provenance Gold Intercepts 1.01 g/t Gold Over 108.20m Within 172.21m of 0.82 g/t Gold from Surface, Extending Mineralization 730 Meters South, Identifying A Major New Target at Eldorado West
Newsfile· 2025-10-08 09:00
Core Insights - Provenance Gold Corp. has reported significant step-out drilling results from the Herman Area of its Eldorado gold project, indicating a substantial expansion of gold mineralization potential at Eldorado West [1][4][5] Exploration Results - Drill holes ED27 and ED28, located 730 meters south of hole E26, intersected extensive intervals of gold mineralization from surface, revealing a new mineralized contact zone between sedimentary rocks and diorite [4][5] - ED27 reported 1.25 g/t gold over 44.20 meters within 179.83 meters of 0.67 g/t gold, while ED28 showed 1.01 g/t gold over 108.20 meters within 172.21 meters of 0.82 g/t gold [5][12] - The new contact zone is shallow-dipping and laterally extensive, suggesting a broad exploration target for both bulk-tonnage and high-grade gold mineralization [4][6] Future Exploration Plans - Ongoing exploration includes drilling of hole ED29, which has shown strong visual mineralization, and the arrival of a core rig to further investigate the structural and geological controls of the mineralization [6][7] - Detailed geological mapping is being conducted in preparation for a major step-out drilling program planned for the next year, targeting a 2-3 kilometer area [8]
Onyx Gold Defines Gold Mineralization Right at Surface at Argus North
Newsfile· 2025-10-07 11:15
Core Insights - Onyx Gold Corp. has reported significant gold mineralization at its Argus North Zone, with channel samples showing grades up to 5.0 g/t Au over 4.0 m and drill results indicating potential for a near-surface, road-accessible gold discovery [1][2][6] Group 1: Exploration Results - The ongoing 25,000 metre drill program at the Munro-Croesus Project has revealed a significant zone of gold mineralization right at the surface, located just 2 km off Highway 101 [2][4] - Recent drill holes have shown promising results, including 60.8 m grading 1.2 g/t Au in MC25-200 and 37.8 m grading 1.8 g/t Au in MC25-202, with notable high-grade intervals [5][8] - The Argus North Zone has demonstrated excellent vertical continuity of mineralization, traced from surface to over 350 meters depth, with the system remaining open along strike and down-dip [9][10] Group 2: Financial Position and Future Plans - Onyx Gold has recently closed a $20 million bought-deal financing and is set to close an additional $6.4 million non-brokered financing, positioning the company well for continued exploration through 2026 [6][27] - The company has completed 64 drill holes, with assays announced for 18 holes to date, completing approximately 20,000 m (80%) of the expanded drill program [12][26] Group 3: Geological Context - The Munro-Croesus Project is located in the Abitibi greenstone belt, a premier gold mining jurisdiction in Canada, covering 109 km² of highly prospective geology [26][27] - The project includes the past-producing Croesus Gold Mine, known for yielding some of the highest-grade gold in Ontario, enhancing its exploration potential [25][26]