Workflow
Flow Assurance
icon
Search documents
NOV Wins ExxonMobil Guyana Contract for Hammerhead Subsea System
ZACKS· 2025-12-22 17:46
Core Insights - NOV Inc. has secured a contract from ExxonMobil for the Hammerhead field in Guyana, focusing on an actively heated flexible pipe system, enhancing NOV's position in deepwater subsea technologies [1][9] Contract Scope - The contract encompasses the full scope of work including design, engineering, procurement, fabrication, and testing of a system that includes four actively heated risers and production flowlines over approximately 14.4 kilometers [3][9] Technology and Benefits - The solution integrates NOV's Optiflex flexible pipe technology with active heating to ensure temperature control in deepwater conditions, which reduces flow assurance risks, enhances uptime, and facilitates smoother restarts, minimizing costly interventions [4][9] Project Impact - The Hammerhead project is part of ExxonMobil's expanding offshore portfolio in Guyana, expected to commence production in 2029, targeting an output of around 150,000 barrels of oil per day and 90 million cubic feet of gas per day by the end of the decade [6] Industry Outlook - ExxonMobil, with a 45% interest in the Stabroek Block, anticipates that Guyana's oil output will exceed 1.7 million barrels per day by 2030, with total hydrocarbon capacity nearing two million barrels of oil equivalent per day [2]