Gas Exploration
Search documents
Eni discovers more than 1tcf of gas near Libya’s Bahr Essalam field
Yahoo Finance· 2026-03-17 09:11
Core Insights - Eni has announced two significant gas discoveries in Libyan waters, estimated to contain over one trillion cubic feet (tcf) of gas [1][2] - The discoveries were made at Bahr Essalam South 2 (BESS 2) and Bahr Essalam South 3 (BESS 3), located approximately 85km offshore [1] - The gas is intended for domestic use in Libya and export to Italy, with integration into existing production systems expected to be swift due to proximity to current infrastructure [2] Company Overview - Eni has been operating in Libya since 1959 and is a major international player in the region, with projected equity production of around 162,000 barrels of oil equivalent per day by 2025 [4] - The company is currently executing three developmental projects, with two expected to commence this year [4] - Eni operates the Bahr Essalam gas and condensate field through a joint venture with the Libyan state-owned National Oil Corporation (NOC) [3] Exploration and Production Details - The gas was discovered within the Metlaoui Formation, which is recognized as a key reservoir in the region [2] - Drilling operations were conducted at depths of approximately 650ft, validating the productive capacity of the reservoir through well tests [2] - The Bahr Essalam field is Libya's largest offshore production site, with production having started in 2005 [3]
ConocoPhillips and partners find gas in exploration well in Otway Basin
Yahoo Finance· 2025-11-17 15:25
Core Insights - ConocoPhillips and its partners have discovered gas-bearing zones at the Essington-1 exploration well in the Otway Basin, Australia, with drilling commencing on November 1, 2025 [1] - The exploration well reached a total depth of 2,735 meters without incident, indicating successful drilling operations [1] Geological Findings - Wireline logging revealed gas presence in both the Waarre A and Waarre C sandstones, with the Waarre A showing a gross gas-bearing interval of 62.6 meters and net pay of 58.5 meters, while the Waarre C has a gross interval of 33.2 meters and net pay of 31.5 meters [2] - Gas peaks were identified at depths of 2,265 meters for the Waarre C and 2,515 meters for the Waarre A, correlating with increased resistivity readings [2] Evaluation and Testing - A petrophysical evaluation of wireline data has been completed, confirming the presence of moveable gas through pressure data analysis [3] - A comprehensive formation evaluation program is underway, utilizing wireline logs across the well's 8½ inch hole section [3] Future Steps - Wireline formation testing will be conducted using Schlumberger's Ora platform to assess reservoir mobility, connectivity, and hydrocarbon composition [4] - The results from these tests will inform the recoverability and commercial potential of the hydrocarbons found at the Essington-1 well [5] Stakeholder Involvement - ConocoPhillips Australia operates the project with a 51% stake, while Korea National Oil Company holds 29% and 3D Energi has 20% [5] - 3D Energi's executive chairman expressed optimism about the early results, indicating clear signs of gas-bearing sandstones [5][6]
ConocoPhillips starts exploration in Australia’s Otway Basin
Yahoo Finance· 2025-11-03 14:41
Core Insights - ConocoPhillips, in partnership with 3D Energi, has initiated drilling at the Essington-1 gas exploration well in the Otway Basin, Victoria, Australia, as part of the Otway exploration drilling programme (OEDP) aimed at exploring natural gas reserves for the East Coast market [1][2] Exploration Details - The Essington-1 well is targeting a total of 262 billion cubic feet (bcf) of mean prospective resources across the Waarre C and Waarre A reservoirs, with the Waarre C reservoir having a 76% chance of success and an estimated 76 bcf of resources, while the Waarre A reservoir, the primary target, is believed to contain 186 bcf of resources with a 68% chance of success [2] - The drilling operation is expected to last approximately 32 days, reaching a total depth of 2,650 meters true vertical depth subsea (TVDSS), depending on operational conditions [3] Strategic Importance - The drilling of Essington-1 is seen as a significant milestone for 3D Energi, with the potential to enhance the resource base and support the future energy needs of the East Coast's domestic gas supply [4] - Following the completion of Essington-1, further evaluations, including wireline logging, will be conducted to assess hydrocarbon presence and reservoir quality [4] Future Plans - Essington-1 is the first of two wells planned in the initial phase of the OEDP, with a total of up to six wells proposed to identify commercially viable gas reserves [5] - After completing the Essington-1 drilling, the Transocean Equinox rig will proceed to drill the Charlemont-1 exploration well, located 20 km northwest within the same permit area [5]