Workflow
Gold production revival
icon
Search documents
LaFleur Minerals Begins Permitting Process for a Bulk Sample from the Swanson Deposit to be Processed at its Beacon Gold Mill
Newsfileยท 2025-05-01 13:15
Core Viewpoint - LaFleur Minerals has initiated the permitting process for a bulk sample from the Swanson Gold Deposit, which will be processed at its Beacon Gold Mill, aiming to advance towards gold production and enhance resource estimates in the Abitibi Gold Belt [1][3][20] Group 1: Project Development - The bulk sample will be approximately 100,000 tonnes with an estimated average grade of 1.89 g/t Au, containing about 6,350 ounces of gold, representing roughly 3% of the current mineral resource estimate for the Swanson Project [5][15] - Historical drill results from the Swanson deposit show promising grades, including 4.44 g/t Au over 36.0 meters and 3.62 g/t Au over 41.0 meters, indicating high potential for the project [4][15] - The permitting process is streamlined due to the deposit being located on a Mining Lease, which allows for a larger bulk sample compared to standard mining claims [4][9] Group 2: Economic Considerations - The company plans to conduct a Scoping Study if the bulk sample proves viable, evaluating mine design, processing methods, and overall project economics [2][20] - The Beacon Gold Mill, capable of processing over 750 tonnes per day, is positioned to restart operations, targeting an annual production of approximately 30,000 to 40,000 ounces of gold at current elevated prices [17][20] - The price of gold has significantly increased from USD$2,000 per ounce to nearly USD$3,500 per ounce over the past year, enhancing the economic viability of the Swanson project and the Beacon Mill [6][17] Group 3: Strategic Positioning - LaFleur Minerals aims to transition from explorer to producer by efficiently meeting operational milestones and leveraging existing infrastructure in the Abitibi region [3][20] - The Swanson Gold Project spans over 16,000 hectares and includes several gold-rich prospects, benefiting from excellent access to roads and local workforce, which reduces operational costs [10][22] - The company is committed to a responsible and transparent permitting process, working closely with regulatory bodies and local communities [11][20]