Grade Control Drilling
Search documents
Orezone Intercepts 3.28 g/t Gold Over 26.00m and 5.55 g/t Gold Over 15.00m at P17 Zone in Advance of Hard Rock First Gold
Globenewswire· 2025-12-03 22:29
VANCOUVER, British Columbia, Dec. 03, 2025 (GLOBE NEWSWIRE) -- Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to report shallow, high-grade confirmatory grade control drill results from the P17 Zone at its flagship Bomboré Gold Mine. The P17 Zone is a high-grade hard rock deposit outcropping at surface located at the southern end of the Bomboré mining lease. In addition to several phased oxide pits, which have locally been advanced into the hard rock, t ...
Kiniero Grade Control Drilling Continues To Return High-Grade Gold Results
Globenewswire· 2025-07-10 10:54
Core Viewpoint - Robex Resources Inc is progressing towards its first gold production at the Kiniero Gold Project in Guinea, with positive results from the Mansounia grade control drilling program indicating strong gold grades and mineral continuity [1][3][4]. Group 1: Drilling Results - Significant intercepts from the grade control drilling include: - 19m at 2.10g/t Au from 23m in hole MGC25-10036 - 18m at 2.49g/t Au from 14m in hole MGC25-10213 - 11m at 3.35g/t Au from 11m in hole MGC25-10464 - 7m at 9.24g/t Au from 4m in hole MGC25-20165 - 11m at 3.03g/t Au from 35m in hole MGC25-10102 [3][4][5]. - The ongoing drilling program has completed 61,700 meters, with further assays expected [6][7]. Group 2: Project Development - The pre-production grade control drilling program at Mansounia is designed to infill resource estimation drilling ahead of mining, with a total of 1,605 inclined drill holes planned for 66,000m [4][5]. - The drilling targets areas within the proposed open pit design, focusing on zones identified for early-stage mining [5][6]. Group 3: Financial Developments - On July 9, 2025, Robex secured an amendment to its US$130 million Facility Agreement with Sprott, releasing US$25 million from the Cash Sweep Account to fund construction of the Kiniero project [6][19]. - This financial development is viewed positively for the company's operations in Guinea [6][19].