Workflow
LED technology
icon
Search documents
Cree LED Introduces Fully Assembled L2 PCBA Solutions That Address a Wide Range of Indoor and Outdoor Lighting Use Cases
Businesswire· 2026-01-13 16:30
Core Insights - Cree LED has launched a new Level 2 (L2) Solutions portfolio, providing both standard and custom fully-populated LED PC board assemblies (PCBAs) to streamline sourcing for lighting manufacturers [1][2]. Group 1: Product Offerings - The L2 Solutions portfolio includes standard PCBAs stocked through an existing distribution network with low to no minimum order quantities, making them accessible for manufacturers of all sizes [3]. - Custom L2 products are available for high-volume orders, offering expanded design flexibility and optional engineering support, utilizing Cree LED's established XLamp and J Series platforms [4]. Group 2: Market Position and Strategy - Cree LED emphasizes its decades of reliability expertise and global manufacturing capabilities to provide customers with stability and trusted support [2]. - The company leverages its global manufacturing network to ensure supply stability and flexibility in production based on customer demand [2]. Group 3: Company Background - Cree LED, a brand of Penguin Solutions, has over 35 years of innovation in the LED industry, offering a broad portfolio of application-optimized LED chips and components [6]. - The company is recognized for its strong IP portfolio and unique business model that ensures supply chain continuity and delivers best-in-class technology for various lighting applications [6].
Tennessee Titans Bring ‘Ring Of Fire’ to Game-Day with 37-Display Super System at the New Nissan Stadium
Globenewswire· 2025-04-21 17:00
Core Insights - Daktronics has been selected as the official large display partner for the Tennessee Titans, set to manufacture and install 37 LED displays totaling over 77,000 square feet at the new Nissan Stadium, which will open in 2027, ranking it among the top three stadiums in the league for total LED square footage [4][5][6] Display Features - The installation includes a unique "Ring of Fire" display that encircles the upper bowl of the stadium, measuring 13 feet high and 2,275 feet wide, totaling 29,575 square feet, making it the longest display in the league with a 10-millimeter pixel spacing for clear images [5][6][8] - The main video displays will be located in the east, northwest, and southwest end zones, with the east display measuring 41 feet high by 343 feet wide, totaling 14,063 square feet, while the combined area of all three displays will be 25,215 square feet [8][9][10] Additional Displays - The stadium will feature 23 ribbon and vomitory displays totaling over 17,000 square feet, all with 10-millimeter pixel spacing, enhancing the visual experience during events [11] - Four concourse displays will add 1,125 square feet, and a west entry lobby display will measure 161.5 square feet, utilizing narrow pixel pitch technology for high-quality imagery [12] - An exterior display on the south side will measure 3,750 square feet, the largest of its type in the league, while an east lower bowl exterior display will measure 140 square feet with a 4.4-millimeter pixel spacing [13] Company Background - Daktronics, founded in 1968, is a leader in large-format LED video displays and audiovisual systems, serving various sectors including sports, business, and transportation [16]