Mine Planning

Search documents
Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 45.24 G/T Gold Over 3.0 Meters, Including 233.92 G/T Gold Over 0.5 Meters
Globenewswireยท 2025-10-06 12:15
HIGHLIGHTS 2,279 m of infill drilling completed on 10-m drill spacing in 24 drill holes from August 2025 representing ~17.5% of the total planned 13,000-m infill program Highlight intercepts include: 45.24 g/t Au over 3.0 m, including 233.92 g/t Au over 0.5 m, 41.17 g/t Au over 2.1 m, and 16.36 g/t Au over 4.6 mInitial results show good continuity consistent with modelled vein zones and planned stopes, including high-grade intercepts within and adjacent to modelled reserve stopes, reinforcing the potential ...