Workflow
NI 43 - 101 Technical Report
icon
Search documents
Vanguard Mining Engages Hardline Exploration for NI 43-101 Technical Report Update at Brussels Creek Gold-Copper-Palladium Project, Kamloops, BC
Thenewswire· 2025-12-19 08:05
Core Viewpoint - Vanguard Mining Corp. has engaged Hardline Exploration Ltd. to prepare an NI 43-101 Technical Report for its Brussels Creek Gold-Copper-Palladium Project, marking a significant step in advancing the project towards further exploration [1][2]. Project Development - The Brussels Creek Project is located in the Kamloops Mining District of British Columbia and is 100% owned by Vanguard Mining [1]. - A comprehensive surface sampling program was recently completed, with assay results pending, and the NI 43-101 Technical Report is expected to be finalized by the end of January 2026 [2][3]. - The 2025 sampling program followed up on a previous drill intercept of 5.08 g/tonne gold over 3.5 meters, reported in 2023, and included 21 rock samples and 127 soil samples [4]. Sampling and Analysis - All samples were sent to SGS Canada Inc. for analysis, utilizing industry-standard methods for gold and platinum group metals [5][8]. - The analytical results will be compiled and reviewed by the company's Qualified Person, with a focus on prioritizing targets for a potential 2026 drilling program [6]. Strategic Importance - The Brussels Creek Project is strategically located adjacent to New Gold Inc.'s New Afton Mine, enhancing its exploration potential within the prolific Quesnel Terrane [14]. - The region's strategic importance has been underscored by Coeur Mining Inc.'s recent acquisition of New Gold Inc. for US$7 billion, creating a combined mining company valued at US$20 billion [13]. Community Engagement - Vanguard Mining is committed to collaborating with the Stk'emlúpsemc te Secwépemc Nation, focusing on local employment, environmental stewardship, and transparent engagement throughout exploration activities [16]. Historical Context - Historical sampling from 1983-1984 identified a 200 m × 400 m anomalous zone with gold values up to 3.5 g/t, and recent grab samples have confirmed high-grade surface mineralization [19].
Renforth Files Malartic Metals Package Critical Minerals NI 43-101 Technical Report, Including Initial Victoria Nickel Sulphide Polymetallic Deposit Inferred Mineral Resource Estimate
Thenewswire· 2025-11-11 13:00
Core Insights - Renforth Resources Inc. has filed the NI 43-101 Technical Report supporting the initial Inferred Mineral Resource Estimate for its Victoria nickel sulphide polymetallic deposit [1][6] - The Technical Report is accessible on SEDAR+ and the company's website [6] Mineral Resource Estimate - The initial Inferred Mineral Resource Estimate for the Victoria deposit includes 155 million tonnes with nickel (Ni) content of 0.12%, copper (Cu) at 0.02%, cobalt (Co) at 0.01%, zinc (Zn) at 0.08%, and silver (Ag) at 0.38 g/t [2] - The nickel equivalent (NiEq) is reported at 0.15% [2] Additional Findings - The Technical Report also covers other mineralization areas within the Malartic Metals Package Property, including the Beaupré copper discovery and gold targets in the central area [3][4] - Lithium prospecting results from the Victoria stripped area are summarized in the report [4] Compliance and Approval - The technical contents of the press release have been reviewed and approved by an independent Qualified Person, Antoine Yassa, P.Geo. [7]