New Energy Pricing Mechanism

Search documents
全国首个新能源机制电价竞价细则发布
中关村储能产业技术联盟· 2025-08-08 09:37
Core Viewpoint - The article discusses the implementation details of the new pricing mechanism for renewable energy projects in Shandong Province, focusing on the competitive bidding process for wind and solar power projects set to be operational between June 1 and December 31, 2025 [2][9]. Bidding Parameters - The total scale of the mechanism electricity is set at 9.467 billion kWh, with wind power accounting for 8.173 billion kWh and solar power for 1.294 billion kWh [3]. - The minimum bidding submission rate for both wind and solar projects is established at 125% [4]. - The mechanism electricity ratio is set at 70% for wind projects and 80% for solar projects [5]. - The bidding price limits are defined, with a maximum of 0.35 yuan per kWh for both wind and solar, and a minimum of 0.094 yuan for wind and 0.123 yuan for solar [5]. Execution Period - The execution period for deep-sea wind power is set at 15 years, while other projects will have a 10-year period [6]. Calculation of Mechanism Electricity - Specific formulas for calculating mechanism electricity for various types of projects are provided, including land-based wind, offshore wind, and both centralized and distributed solar power [6][7]. Bidding Subject - The bidding participants must be projects that have been completed and those expected to be operational by December 31 of the following year, which have not previously been included in the mechanism pricing [8][15]. Bidding Organization - The bidding will be organized separately for different technology types, such as solar and deep-sea wind, unless there is a lack of effective competition [8][24]. Bidding Volume - The annual new electricity volume included in the mechanism will be determined based on the completion of renewable energy consumption responsibilities and user affordability [23]. Bidding Process - The bidding process is scheduled to be organized annually in October, with the first bidding taking place in August 2025 [31]. Guarantee Mechanism - Requirements for performance guarantees are specified for both operational and non-operational projects, with specific amounts calculated based on project capacity and bidding parameters [35][36]. Conclusion - The implementation details aim to promote high-quality development of renewable energy in Shandong Province, ensuring a structured and competitive bidding process for future projects [9][39].