Nuclear waste treatment
Search documents
Perma-Fix Environmental Services Receives Expanded Permit for Richland Facility, Approximately Tripling Liquid Mixed Waste Processing Capacity
Globenewswire· 2026-01-09 13:30
Core Insights - The renewal of the Dangerous Mixed Waste Permit for Perma-Fix Northwest (PFNW) significantly enhances the company's operational capacity and strategic positioning in the nuclear services market [1][2][10] Permit Renewal Details - The renewed permit updates PFNW's original 1999 permit to align with current treatment units, infrastructure, safety systems, and operating practices [2] - The permit became effective on January 1, 2026, following a comprehensive public comment period and a Final Supplemental Environmental Impact Statement [3] Capacity Expansion - The permit renewal approximately triples PFNW's permitted liquid mixed waste processing capacity, increasing annual throughput from about 400,000 gallons to approximately 1.2 million gallons [5] - Additionally, PFNW is authorized to process up to 175,000 tons of waste annually through macroencapsulation, enhancing operational flexibility [6] Strategic Positioning - The renewal secures a regulatory foundation for PFNW to pursue future permit modifications related to new technologies and expansion initiatives [7] - PFNW is positioned to support planned facility upgrades for upcoming West Area Tank retrieval milestones at the Hanford site, leveraging its proximity and specialized capabilities [8] Market Context - The complexity of the permitting process underscores the significant regulatory, technical, and operational barriers in the nuclear services market [9] - PFNW stands as the only permitted mixed waste treatment facility near the Hanford site, providing a competitive advantage that is challenging to replicate [9]
PyroGenesis Signs Contract Toward the Use of Plasma in the Treatment of Low-Level Radioactive Waste
Globenewswire· 2025-12-17 12:00
Core Viewpoint - PyroGenesis Inc. has signed an initial design phase contract with a European organization specializing in radioactive waste processing and nuclear decommissioning, focusing on the development of a plasma furnace for treating low-level radioactive waste [1][2]. Company Overview - PyroGenesis is a leader in ultra-high temperature processes and engineering innovation, providing plasma-based technology solutions to heavy industry and defense [1][10]. - The company has over 34 years of experience in plasma technology and serves various sectors, including aluminum, aerospace, steel, and environmental services [10]. Project Highlights - The contract aims to define technical specifications, sizing, and design parameters for a plasma-equipped furnace as part of a potential radioactive waste vitrification and treatment plant in Europe [5]. - The project includes an engineering study, simulations, and design evaluations comparing plasma torch furnaces to electric arc furnaces [5]. Industry Context - The European Union relies on nuclear power for approximately 24% of its electricity, with around 100 nuclear reactors across 12 countries [12]. - The nuclear installed capacity in the EU is projected to increase from 98 GWe in 2025 to approximately 109 GWe by 2050, leading to a rise in low- and very-low-level radioactive waste [12]. - Low-level radioactive waste constitutes about 61% of the stored volume of radioactive waste in the EU, while very-low-level waste accounts for around 30% [12][6]. Strategic Impact - The growing nuclear capacity in the EU necessitates the development of safe and effective treatment processes for low-level radioactive waste, positioning PyroGenesis' plasma-powered furnace systems as a viable solution [6][7].