Workflow
Project Economics
icon
Search documents
U.S. EXIM's Board Advances Proposed $2.7 Billion Loan to Congressional Notice & Perpetua Announces Improved Project Economics
Prnewswire· 2026-03-31 12:43
U.S. EXIM's Board Advances Proposed $2.7 Billion Loan to Congressional Notice & Perpetua Announces Improved Project Economics Accessibility StatementSkip Navigation Updated Project Economics demonstrate Stibnite as a premier gold-antimony asset with base case after-tax NPV5% of $3.5 billion at $3,250/oz gold, increasing to $6.1 billion NPV5% at $4,500/oz gold1 Cash balance of $714 million at year-end together with proposed $2.2 billion direct loan, if approved, would fund all estimated direct capital co ...
Thesis Gold Drills 89.3 Metres of 1.10 Grams per Tonne Gold to Extend Mineralization at the Bingo Zone
Prnewswire· 2025-10-06 10:30
Core Viewpoint - Thesis Gold Inc. has announced promising drill results for the 2025 season and the completion of an 86 line-kilometer Induced Polarization (IP) geophysical survey at its Lawyers-Ranch Project, indicating significant exploration potential and resource expansion opportunities [1][3][4]. Exploration and Drilling Results - The company focused on resource expansion at the Bingo zone, with drilling results indicating high-sulfidation mineralization and the potential for further growth in the resource base [2][5][7]. - Drillhole 25BNGDD001 intersected 0.73 grams per tonne gold, 2.17 grams per tonne silver, and 0.35% copper over 13.61 meters, with a deeper interval showing 80.02 grams per tonne silver and 0.47% copper [5][9]. - Drillhole 25BNGDD002 revealed 89.30 meters of 1.10 grams per tonne gold from surface, including a 12.00-meter interval of 2.31 grams per tonne gold, indicating mineralization extending beyond current resource models [5][9]. Economic Assessment - The 2024 Preliminary Economic Assessment (PEA) highlighted strong project economics, with an after-tax NPV (5%) of C$1.28 billion and an IRR of 35.2%, suggesting significant value creation potential [2][4][14]. - The company plans to update project economics in Q4 2025 with the results of a Prefeasibility Study (PFS) [3][4]. Geophysical Survey Insights - The recent IP survey has identified several new targets, enhancing the understanding of previously untested areas within the project [5][6]. - The survey covered 86.1 line-kilometers and is expected to provide important context for future exploration efforts [5][6]. Management Commentary - The President and CEO emphasized the project's potential beyond the 2024 PEA, highlighting the ongoing exploration efforts and the promising results from the Bingo zone [4][14].