Lithium (Li₂O)
Search documents
Q2 Metals Extends Known Mineralized Zone with 179.2 Metre Intercept of 1.24% Li₂O at the Cisco Lithium Project
Globenewswire· 2026-01-22 12:00
Core Viewpoint - Q2 Metals Corp. has reported positive analytical results from its 2025 drill program at the Cisco Lithium Project, indicating significant growth potential and the upcoming delivery of an inaugural inferred Mineral Resource Estimate in Q1 2026 [2][3]. Exploration and Drilling Results - The 2025 Drill Program included a total of 74 drill holes, amounting to 31,961 meters, with ongoing drilling focused on infill drilling to upgrade inferred resources to indicated status [4][7][29]. - Drill hole CS25-065 revealed a mineralized pegmatite interval of 179.2 meters at an average grade of 1.24% Li2O, extending the known Mineralized Zone to the north [4][16]. - Drill hole CS25-057 encountered a 49.8-meter interval averaging 1.41% Li2O, consistent with previous drilling results [4][16]. - The Exploration Target published in July 2025 estimated potential lithium mineralization of 215 to 329 million tonnes at grades ranging from 1.0% to 1.38% Li2O based on the first 40 holes drilled [6][28]. Future Plans and Objectives - The company aims to complete an inaugural Preliminary Economic Assessment by late 2026, with a primary focus on upgrading the inferred mineral resources [3][29]. - The ongoing exploration program will also test areas surrounding the Mineralized Zone to further assess the project's potential [17][29]. Corporate Developments - Q2 Metals has granted stock options and performance share units to its directors and officers as part of its Equity Incentive Plan, aimed at aligning interests with shareholder value [20][21]. - The company is actively participating in upcoming industry events, including the Vancouver Resource Investment Conference and the Prospectors & Developers Association Convention [23].
Q2 Metals Intercepts 457.4 metres of 1.65% Li₂O in Drill Hole 44 at the Cisco Lithium Project
Globenewswire· 2025-12-03 08:44
Core Insights - Q2 Metals Corp. reports significant progress in its 2025 drill program at the Cisco Lithium Project, highlighting drill hole 44 as a major discovery with extraordinary width and grade, which will support the upcoming Mineral Resource Estimate expected in Q1 2026 [2][3][4] Drill Program Results - The 2025 Drill Program has completed 2,200.4 meters of drilling across four drill holes, with notable results from drill hole CS25-044, which includes two intervals of 457.4 meters at 1.65% Li2O and 36.9 meters at 1.65% Li2O [3][4] - Drill hole CS25-044 is noted as the widest continuous spodumene pegmatite interval drilled by the company to date, contributing to the initial Mineral Resource Estimate [4][10] - The ongoing drilling campaign aims to support the initial inferred Mineral Resource Estimate, with infill drilling planned to be completed in the coming weeks [4][10] Exploration Target - The Exploration Target for the Cisco Project estimates potential lithium mineralization between 215 to 329 million tonnes at grades ranging from 1.0% to 1.38% Li2O, based on the first 40 holes drilled [10][16] - The current drilling efforts are focused on infill drilling within the main mineralized zone, which remains open at depth and along strike, indicating further exploration potential [17] Upcoming Events - Q2 Metals team is participating in the Mines & Money Resourcing Tomorrow conference in London, UK, from December 2-4, 2025, to engage with industry stakeholders [11] Quality Assurance and Methods - The company employs rigorous QA/QC protocols in its sampling and analytical processes, including the use of certified reference materials and systematic insertion of blanks to ensure data integrity [12][13]