Lithium (Li₂O)
Search documents
Q2 Metals Intercepts 457.4 metres of 1.65% Li₂O in Drill Hole 44 at the Cisco Lithium Project
Globenewswire· 2025-12-03 08:44
Core Insights - Q2 Metals Corp. reports significant progress in its 2025 drill program at the Cisco Lithium Project, highlighting drill hole 44 as a major discovery with extraordinary width and grade, which will support the upcoming Mineral Resource Estimate expected in Q1 2026 [2][3][4] Drill Program Results - The 2025 Drill Program has completed 2,200.4 meters of drilling across four drill holes, with notable results from drill hole CS25-044, which includes two intervals of 457.4 meters at 1.65% Li2O and 36.9 meters at 1.65% Li2O [3][4] - Drill hole CS25-044 is noted as the widest continuous spodumene pegmatite interval drilled by the company to date, contributing to the initial Mineral Resource Estimate [4][10] - The ongoing drilling campaign aims to support the initial inferred Mineral Resource Estimate, with infill drilling planned to be completed in the coming weeks [4][10] Exploration Target - The Exploration Target for the Cisco Project estimates potential lithium mineralization between 215 to 329 million tonnes at grades ranging from 1.0% to 1.38% Li2O, based on the first 40 holes drilled [10][16] - The current drilling efforts are focused on infill drilling within the main mineralized zone, which remains open at depth and along strike, indicating further exploration potential [17] Upcoming Events - Q2 Metals team is participating in the Mines & Money Resourcing Tomorrow conference in London, UK, from December 2-4, 2025, to engage with industry stakeholders [11] Quality Assurance and Methods - The company employs rigorous QA/QC protocols in its sampling and analytical processes, including the use of certified reference materials and systematic insertion of blanks to ensure data integrity [12][13]