Workflow
Ni₃Fe)
icon
Search documents
First Atlantic Nickel Expands RPM Zone Awaruite Nickel-Alloy (Ni₃Fe) Discovery: 400-Meter Northern Extension Yields 1.47% Nickel Concentrate Over 351 Meters in DTR Metallurgical Recovery Testing
Globenewswire· 2025-07-09 10:00
Core Insights - First Atlantic Nickel Corp. announced positive metallurgical test results from drill hole AN-24-05, confirming the extension of awaruite mineralization in the RPM Zone of the Atlantic Nickel Project [1][5][6] - The Phase 1 drilling program has defined a mineralized area of approximately 400 meters by 500 meters, with all four holes intersecting significant awaruite nickel mineralization [2][5][7] - Phase 2 drilling is currently underway to expand the mineralized footprint and further define the extent of awaruite nickel mineralization [14][15] Phase 1 Drilling Results - Drill hole AN-24-05 returned a continuous interval of 351 meters averaging 1.47% nickel and 1.53% chromium in magnetic concentrate, with a mass pull of 8.21% [4][5][6] - The total nickel recovery from AN-24-05 was 50.26%, highlighting the effectiveness of magnetic separation for upgrading awaruite nickel mineralization [5][6] - All four holes in Phase 1 returned consistent nickel grades ranging from 1.32% to 1.47% and mass pulls between 8.21% and 9.53% [2][7] Awaruite Mineralization Potential - The RPM Zone is located within a 30 km long ultramafic nickel belt, indicating significant district-scale potential for awaruite mineralization [5][16] - Awaruite's properties allow for smelter-free processing, which aligns with the U.S. Inflation Reduction Act's requirements for critical minerals [16][27] - The U.S. Geological Survey highlighted the potential of awaruite deposits to alleviate nickel concentrate shortages and provide a cleaner processing alternative compared to conventional nickel sources [17][19] Phase 2 Exploration - The Phase 2 drilling campaign aims to systematically expand the RPM Zone's mineralized area, with strategic step-out drilling in multiple directions [14][15] - Enhanced project infrastructure and equipment optimizations support deeper drilling capabilities, positioning the Phase 2 campaign for meaningful growth [15][27] - The findings from Phase 1 provide a solid foundation for the ongoing exploration efforts, with all holes ending in mineralization and remaining open in all directions [7][14]