SureTREATTM chemical injection valves
Search documents
Baker Hughes Wins Key Contract to Support Sakarya Gas Field Phase 3
ZACKS· 2025-09-12 15:01
Core Insights - Baker Hughes Company (BKR) has secured a contract from Turkish Petroleum (TPAO) and the Turkish Petroleum Offshore Technology Centre (TP-OTC) for the development of Phase 3 of the Sakarya gas field, focusing on subsea production and intelligent completion systems [1][4] Group 1: Contract Details - BKR will supply deepwater horizontal tree systems and related subsea equipment designed for operations at water depths of 6,500-7,200 feet, enhancing offshore production efficiency [2][3] - The contract includes advanced upper and lower completions systems that will improve gas production efficiency by enabling multizonal control of the reservoir [3] Group 2: Importance to Turkey's Energy Sector - The Sakarya gas field is a crucial asset for Turkey's energy sector, and BKR's expertise in subsea technologies is vital for increasing output from the field [4] - BKR has been involved with TPAO and TP-OTC since the inception of the Sakarya gas field development in 2022, indicating a long-term partnership [4] Group 3: Technology Utilization - A comprehensive range of BKR's completion technologies, including InForceTM HCMTM-A interval control valves and SureSENSTM QPT ELITE gauges, will be utilized to enhance engineering and operational efficiencies in the gas field [4]
Baker Hughes to Supply Integrated Subsea, Completion Systems for Turkish Petroleum's Sakarya Gas Field Phase 3
Globenewswire· 2025-09-11 11:00
Core Insights - Baker Hughes has received a significant contract from Turkish Petroleum (TPAO) and Turkish Petroleum Offshore Technology Center (TP-OTC) to supply subsea production and intelligent completion systems for the Sakarya Gas Field Phase 3 [1][2] Group 1: Project Details - The agreement includes the provision of deepwater horizontal tree systems and associated subsea structures and control systems for production at depths ranging from 6,500 to 7,200 feet [2][4] - Baker Hughes will integrate advanced completions technologies such as InForce HCMTM-A interval control valves and SureTREAT chemical injection valves to enhance operational efficiencies [4] Group 2: Strategic Importance - The development of the Sakarya gas fields is pivotal for transforming Turkey's energy sector, contributing to a more prosperous and secure future for the country [3] - Baker Hughes has been collaborating with TPAO and TP-OTC since the project's inception in 2022, focusing on reservoir and technology evaluations for the unique subsurface geology of the field [3] Group 3: Timeline and Execution - Deliveries and execution for the Sakarya Gas Field Phase 3 are set to commence in late 2025 [4]