Kosmos Energy(KOS) - 2024 Q4 - Earnings Call Transcript

Financial Data and Key Metrics Changes - Kosmos Energy Ltd. reported a significant reduction in capital expenditures (CapEx) expected to fall from over 800millionin2023and2024to800 million in 2023 and 2024 to 400 million in 2025, representing a decrease of over 50% [10][28] - The company achieved a year-end 2024 2P reserves of 513 million barrels of oil equivalent, with a reserve replacement ratio of 137%, indicating strong reserve growth [13][15] - The company maintained a strong financial position by raising 900millioninnewbondsandrefinancingitsreservebasedlendingfacility,extendingaveragedebtmaturitytoaroundfouryears[20][25]BusinessLineDataandKeyMetricsChangesProductionforQ42024waslowerthanguidanceduetoissuesattheJubileefield,butactionshavebeentakentoresolvetheseissues,andproductionisexpectedtostabilize[21][22]ThecompanyachievedfirstoilatWinterfellinsummer2024andexpectsproductiontoriseasnewwellscomeonline[18][19]TheGulfofAmericabusinessunitisprojectedtoseea20900 million in new bonds and refinancing its reserve-based lending facility, extending average debt maturity to around four years [20][25] Business Line Data and Key Metrics Changes - Production for Q4 2024 was lower than guidance due to issues at the Jubilee field, but actions have been taken to resolve these issues, and production is expected to stabilize [21][22] - The company achieved first oil at Winterfell in summer 2024 and expects production to rise as new wells come online [18][19] - The Gulf of America business unit is projected to see a 20% year-over-year increase in production, with full-year guidance of 17,000 barrels of oil equivalent per day net [49] Market Data and Key Metrics Changes - The company is focusing on the Gulf of America for exploration efforts, leveraging advanced seismic imaging and reservoir management tools [12][44] - The GTA project is expected to ramp up production in Q1 2025, with first LNG production achieved in early February 2025 [34][36] - The company is actively managing oil price volatility through a rolling hedging program, with around 60% of first-half oil production hedged [26][27] Company Strategy and Development Direction - Kosmos Energy Ltd. aims to prioritize cash generation through maximizing revenue and rigorous cost management, with a focus on reducing overhead costs by 25 million by the end of 2025 [11][28] - The company plans to use generated cash flow primarily for debt paydown until reaching a leverage goal of below 1.5 times at mid-cycle oil prices [12][13] - The strategic focus includes enhancing the reserve base and transitioning 2C resources into 2P reserves through improved technology and drilling [15][68] Management's Comments on Operating Environment and Future Outlook - Management expressed confidence in the company's ability to deliver sustainable cash generation due to a strong reserve base and disciplined cost management [15][53] - The company is optimistic about the future potential of the GTA project and its ability to meet local market gas needs while driving low-cost expansions [38][39] - Management acknowledged challenges in production reliability at Jubilee but emphasized ongoing efforts to improve power generation reliability and water injection [111][112] Other Important Information - Kosmos Energy Ltd. achieved zero lost time injuries or total recordable injuries in 2024, maintaining a strong safety performance [17] - The company is not planning to revisit discussions with Tullow, focusing instead on free cash flow accretion and maintaining a strong portfolio [120][121] Q&A Session Summary Question: Discussion on startup costs and their nature - Management indicated that startup and commissioning costs are expected to be one-time in nature, with costs trending lower as production ramps up [56][58] Question: CapEx guidance and potential for lower spending - Management confirmed a CapEx ceiling of $400 million for 2025, emphasizing a focus on capital efficiency and free cash flow generation [63][64] Question: Clarification on GTA phase one plus - Management explained that phase one plus involves fully utilizing existing infrastructure with minimal additional CapEx, aiming for increased production capacity [75][76] Question: Jubilee production assumptions - Management highlighted the importance of achieving 100% voidage replacement and reliable power generation to meet production guidance for Jubilee [82][86] Question: Confidence in Jubilee's performance - Management expressed confidence in addressing past issues and achieving production targets through effective reservoir management and additional drilling [110][112] Question: Future M&A considerations - Management stated that there are no current plans to revisit discussions with Tullow, focusing instead on free cash flow and value accretion [120][121] Question: Timeline for achieving leverage goals - Management anticipates reaching a leverage level of around 1.5 times by the latter half of 2026, with a focus on debt paydown and production growth [127][128] Question: Tortue project CapEx implications - Management indicated that future CapEx for Tortue will be minimal, focusing on sustaining current production levels and maximizing revenue [102][103]