Workflow
Kosmos Energy(KOS) - 2025 Q1 - Earnings Call Transcript
Kosmos EnergyKosmos Energy(US:KOS)2025-05-06 15:00

Financial Data and Key Metrics Changes - The company reported a significant reduction in capital expenditures (CapEx), with first quarter CapEx at $86 million, down from $200 million in the same quarter last year, and expects CapEx to fall by over 50% year on year [7][21] - Operating expenses (OpEx) per barrel of oil equivalent were in line with guidance but higher year on year due to lower production and higher maintenance costs [21] - The company aims to maintain a free cash flow positive status at current oil prices, with a target breakeven of around $50 per barrel Brent in a low price environment [33] Business Line Data and Key Metrics Changes - The company achieved first gas and LNG production in the GTA project, with all four liquefaction trains operational and production ramping up towards a contracted sales volume equivalent to 2,450,000 tons of LNG per annum [10][12] - In Ghana, the company plans to drill two Jubilee wells in 2025 and an additional four in 2026, which are expected to enhance production with low-cost, high-margin barrels [6][15] - Production in the Gulf of America was steady, with a planned thirty-day shutdown completed, and current production ramping back up to around 20,000 barrels of oil equivalent [17] Market Data and Key Metrics Changes - The company noted heightened volatility in the sector and across global markets, but remains focused on cash generation and cost control [5][9] - The company has hedged around 40% of remaining 2025 oil production with a floor of approximately $65 per barrel and a ceiling of approximately $80 per barrel [24] Company Strategy and Development Direction - The company is prioritizing cash generation, rigorous cost control, and enhancing financial resilience amid market volatility [4][9] - Future upside potential at the GTA project includes increased production through existing facilities and low-cost modifications, with plans to explore upgrades to the FLNG vessel to increase LNG production capacity [12][13] - The company is actively managing its options to maintain financial resilience, including reducing overhead costs and managing capital expenditures [25] Management's Comments on Operating Environment and Future Outlook - Management expressed confidence in the company's ability to navigate a volatile market, emphasizing the importance of cash generation and cost discipline [26] - The company anticipates production growth in the second half of the year due to the ramp-up of the GTA project and upcoming drilling activities in Ghana and the Gulf of America [26] Other Important Information - The company has a long-term value proposition supported by a 2P reserves production line of over twenty years [26] - The company is exploring potential upgrades to enhance the overall returns of the GTA project and is working with partners to optimize existing infrastructure [12][13] Q&A Session Summary Question: Can you talk about the nameplate capacity test at GTA and the timeframe for understanding potential rates? - The nameplate capacity of the FLNG vessel is 2,700,000 tons per annum, and testing is ongoing to determine reliable delivery rates above this capacity [30] Question: How do you see your breakevens today and how might they evolve in future years? - The target breakeven is around $50 per barrel Brent, with a focus on high-return Jubilee infill wells that have a low breakeven of around $30 per barrel [33] Question: How are you thinking about financial leverage in a lower commodity price environment? - The company aims to reduce financial leverage and maintain liquidity, with plans to generate free cash flow to pay down debt [40] Question: What are the steps regarding the obligation offtake physically and financially? - The National Oil Company is responsible for building the pipeline infrastructure, and the company does not have capital liability for that [84] Question: Is there any annual quota of volumes of cargoes contracted to sell to BP? - The annual contract quantity is 2,450,000 tons per annum, with a price of 0.9595% slope against Brent FOB [76]