Workflow
Viridis Mining and Minerals (VMM) Earnings Call Presentation
2025-08-10 22:00

Project Overview - Colossus project boasts a world-class global resource of 493 million tonnes @ 2,508 ppm TREO and 601 ppm MREO [16] - The Measured & Indicated resource stands at 329 million tonnes @ 659 ppm MREO, recognized as the highest grade MREO IAC resource globally [16] - The project covers only 11% of the total landholding (28km2 of 261 km2), indicating significant exploration upside [16, 20] Metallurgical Performance - The project achieves industry-leading "Resource to MREC" recovery rates of 76% MREO in the Northern Concessions and 78% MREO in the Southern Complex [16] - The metallurgical process uses 0.3M Ammonia Sulphate at pH 4.5 and room temperature [16] Economic Viability - The Pre-tax NPV8 is US $1.41 billion (AUD 2.13 billion) with an IRR of 43%, based on a US $90/kg NdPr price [16] - The project is positioned as a lowest-cost REE producer globally, with C1 OPEX of US $6.2/kg TREO and CAPEX of US $286 million (excluding contingency) for a 5Mtpa facility [16] - The LOM average TREO Recovery is 57%, and the LOM average MREO Recovery is 76% [38] Strategic Partnerships and Funding - The company has secured funding support of up to approximately AU$58.5 million [16] - A JV has been established with Ionic Rare Earths (ASX:IXR) for REO separation and refining technology [16]