Q2 2025 Performance Highlights - Gold production increased by 46% from Q1 2025, reaching 30,350 ounces[18, 27] - The average realized gold price increased by 17% to $3,317 per ounce[18, 37] - Revenue increased by 27% to $97.3 million[18, 37] - Cash flow from operations increased by 38% to $35.8 million[18, 37] - Cash and cash equivalents increased by 8% to $114.7 million as of June 30, 2025[18] - All-in sustaining costs (AISC) decreased by 10% to $2,251 per ounce sold[18, 37] - Free cash flow increased significantly by 700% to $5.6 million[18, 37] Operational Performance - Abore mine produced 0.8 million tonnes of ore, an 18% increase from Q1, with an average grade of 0.9 g/t and a strip ratio of 6.2:1, a 17% reduction from Q1[21] - Essase mine produced 0.5 million tonnes of ore with an average grade of 0.7 g/t and a strip ratio of 5.5:1[22] - Waste stripping at Nkran Cut 3 increased by 113% from Q1, with 1.7 million tonnes of waste material mined[26] - Processing costs decreased by 10% to $12.89 per tonne due to higher throughput[41] Exploration and Projects - Phase 2 infill drilling program at Abore expanded to 8,900 meters to test for mineralization extensions[55] - Deep drilling at Abore confirmed the granite and mineralizing system continues 200 meters below the current pit shell[62] - The secondary crusher project was completed on budget and commissioned in late July, aiming to maintain plant throughput at 5.8 million tonnes per annum[36]
Galiano Gold(GAU) - 2025 Q2 - Earnings Call Presentation