Group 1: Investor Relations Activities - The investor relations activity included specific object research and analyst meetings [2] - Participants included representatives from Da Cheng Fund and Yin Hua Fund [2] - The meeting took place on January 27, 2015, in the company's conference room [2] Group 2: Non-Public Issuance Progress - The company has submitted the first feedback response materials to the CSRC regarding the non-public issuance of shares [2] - Further updates to the documents were made based on CSRC requirements, awaiting further notification from the CSRC [2] Group 3: Loss Reduction Project in Ghana - The project aims to convert 450,000 electricity meters in Accra, Ghana, to a prepaid system to reduce electricity theft and losses [3] - The project is a response to severe electricity theft due to shared meters and a complicated billing system [3] - The depreciation of the loss reduction project will be based on the installed assets [3] Group 4: Financial Impact and Revenue Calculation - In E City, South Africa, water and electricity losses amounted to approximately 660 million Rand, equivalent to about 396 million RMB [4] - Revenue before breakeven is calculated using a specific formula based on technical and management loss benchmarks [4] Group 5: Project Replicability and Currency - The South Africa project is considered more replicable than the loss reduction project in Ghana due to better infrastructure and lower engineering difficulty [5] - The loss reduction project is settled in USD, while the South Africa project is settled in Rand [5] Group 6: Future Projects and Funding - The company plans to build a 660 MW gas power plant in Ghana, with a memorandum of cooperation signed with the Volta River Authority [6] - The project will be constructed in three phases, with the first phase expected to cost 150 million USD [6] - Funding gaps for future projects may be addressed through refinancing, government support, or bank financing [6]
晓程科技(300139) - 2015年1月27日投资者关系活动记录表