Core Insights - T2 Metals Corp. has completed the summer/fall phase of core drilling at the Sherridon copper-gold project, achieving an 80% ownership interest in the project as per the Option Agreement with Halo Resources Ltd [2][3]. Drilling Program Details - A total of 2,180 meters were drilled in eight new holes and one deepened hole, with an additional 1,800 meters planned for winter 2025 when access is easier [2][3]. - The drill program is the largest at Sherridon in over a decade, targeting areas with known mineralization and untested geophysical plates [4]. Geological Findings - Multiple holes have intersected massive and disseminated sulphides, including chalcopyrite (copper) and sphalerite (zinc) [5][6]. - Historical production from the Sherridon project includes 7.74 million tonnes at grades of 2.46% Cu, 2.84% Zn, 0.6 g/t Au, and 33 g/t Ag [7]. Community and Support - The drilling program has received strong support from the local First Nations community, including an Exploration Agreement with the Kiciwapa Cree Nation [7]. - The company has also been recognized for its reconciliation efforts, receiving an award from the Manitoba Prospectors and Developers Association [7]. Historical Resource Estimates - Historical Mineral Resource Estimates at the Cold Lake, Lost Lake, Bob, and Jungle prospects total 6.6 million tonnes at 0.85% Cu, 1.22% Zn, 0.4 g/t Au, and 7.4 g/t Ag for Indicated Resources, and 15.9 million tonnes at 0.69% Cu, 0.84% Zn, 0.3 g/t Au, and 5.8 g/t Ag for Inferred Resources [9]. - The project features a large alteration system with over 30 km of strike length containing numerous massive sulphide deposits [9]. Financial Support - The company has received over $500,000 in grants from the Manitoba Mineral Development Fund in the past year, indicating strong provincial support [9].
T2 Metals Completes Summer/Fall Drill Phase at Sherridon, Manitoba, and Earns 80% Interest in Project