Core Viewpoint - ChuanTou Energy has announced that the first unit of the Yinjiang Hydropower Station has entered a 72-hour trial operation and is set to commence commercial operation soon [1] Company Summary - The Yinjiang Hydropower Station is located on the middle reaches of the Jinsha River in Panzhihua, Sichuan Province, and is the last step in the hydropower development of the Jinsha River [1] - The hydropower station began construction in July 2019, achieved river closure in 2021, and completed the installation of the first unit in October 2023 [1] - The total installed capacity of the Yinjiang Hydropower Station is 390 MW, consisting of six large bulb-type axial flow turbine generator sets [1] Industry Summary - The hydropower station is a key clean energy project in Sichuan Province and will contribute to the province's goals of "carbon peak and carbon neutrality" upon its operation [1] - Once operational, the station is expected to deliver nearly 1.6 billion kilowatt-hours of clean energy annually to Panzhihua City [1] - The project will also significantly reduce annual emissions, including 1.3 million tons of carbon dioxide, 4,000 tons of sulfur dioxide, and 4,000 tons of nitrogen oxides [1]
川投能源: 银江水电站提前发电 助力四川“双碳”战略