Core Viewpoint - T2 Metals Corp. has reported significant assay results from its Q4 2024 drill program at the Sherridon VMS Project in Manitoba, highlighting high-grade copper, zinc, gold, and silver mineralization, particularly from the Lost Lake prospect [2][6][12]. Group 1: Drill Program Overview - The Q4 2024 drill program consisted of nine holes, with assay results from the final seven holes indicating substantial mineralization in six of them [2][3]. - The drilling aimed to extend known mineralization and explore undrilled downhole EM anomalies across a 5 km trend [3][6]. Group 2: Significant Drill Results - Notable intersections include: - SHN24015: 6.62 m grading 2.09% Cu, 2.41% Zn, 1.0 g/t Au, and 18.5 g/t Ag [4]. - SHN24016: 4.69 m grading 1.61% Cu, 1.20% Zn, 0.4 g/t Au, and 10.6 g/t Ag [4]. - SHN24012DPN: 1.75 m grading 0.38% Cu, 0.24% Zn, 1.1 g/t Au, and 8.2 g/t Ag [4]. - The results confirm the presence of high-grade polymetallic mineralization extending 250 m down plunge from the Lost Lake historical resource [12][10]. Group 3: Future Exploration Plans - A winter drilling program for Q1 2025 is planned, with the company fully funded for this initiative [6][9]. - The company is prioritizing new areas for testing using combined geophysics, geochemistry, and geological interpretation [9][12]. Group 4: Historical Context - The Sherridon area has a significant mining history with five near-surface copper-rich historical mineral resources [6][22]. - Historical mining at the site yielded 7.74 million tonnes at an average grade of 2.46% Cu, 2.84% Zn, 0.6 g/t Au, and 33 g/t Ag between 1931 and 1951 [22].
T2 Metals Reports High Grade Copper in Drill Results at the Sherridon VMS Project, Manitoba