Core Insights - The company has introduced an innovative "well factory" model for gas management in coal mining areas, significantly improving efficiency in gas governance [1][2] - The implementation of this model allows for centralized drilling and integrated management, enabling one drilling rig to operate on multiple wells simultaneously, thus reducing construction time [1] - By the end of 2024, the company has successfully completed drilling for 14 wells in the Pan San Mine area, achieving a total drilling depth of 27,000 meters, and finishing the project three months ahead of schedule [2] Group 1 - The "well factory" model was first introduced in the coal mining area to address complex gas management challenges [1] - The model allows for simultaneous construction and integrated management, which has broken the traditional single-well governance approach [1] - The company is preparing for integrated fracturing using saturated volume fracturing technology to expedite the gas extraction process [2] Group 2 - A total of 14 wells have been drilled in the Pan San Mine area, with a total drilling length of 27,000 meters [2] - The project was completed more than three months ahead of the original schedule, showcasing the effectiveness of the new drilling approach [2] - The company is currently focused on preparing for the fracturing process to achieve gas extraction targets [2]
淮河能源:“井工厂”模式让地面瓦斯治理提质增效